Information
-
Audit Title/Client/Date (reverse order)
-
Prepared by
-
Location
-
Personnel
EVALUATION
-
Are all activities performed in compliance with an accepted JSEA that is still adequate for the current tasks & conditions?
-
Do all persons appear to understand the requirements of the JSEA & have signed off?
-
Is there evidence that the scaffold structure was inspected by a competent person before & after modification to confirm structural integrity?
-
Is the supporting surface hard & flat?
-
Is the area of operation free of floor penetrations & open edges?
-
Were the castor wheel locked at all times, except during movement of the scaffold?
-
Has a stair or ladder system been provided for access & egress?
-
Do all platforms have top rails, parallel mid rails & toe boards fixed to each open side & end?
-
Are castors with adjustable legs used & adjusted to keep the platform level when supporting surface is at different heights?
-
Is plan bracing used at the base of scaffold to provide greater stability?
-
Have zones been implemented around overhead obstructions in which scaffolding has not been located?
-
Has mobile plant been re-routed away from the location of the scaffold to prevent collision & subsequent compromise to the structure, or barricades, signs, posts, buffer rails, guards or concrete or timber kerbs been used to prevent mobile plant from coming into contact with the scaffolding?
-
Are there any other risks or issues associated with the activities observed?
-
Location of Observation
-
COMMENTS & RECOMMENDATIONS
-
Comments & recommendations to be actioned by
-
Signature of observer