Portable Electrical Tools and Equipment (PETE)

  • Are all items of PETE within inspection & test date? (i.e. within the last 3 months) and fitted with a current test tag.<br>Include details of items checked and the test and tag number for each.

  • Are all RCD’s within inspection and test date? (i.e. within the last month) and fitted with a current test tag.<br>Include details of items checked and the test and tag number for each.

  • Are all items of PETE been used supplied via an RCD?

  • Is there an up to date PETE register? And is required information documented?

  • Is there an up to date RCD register? And is all required information documented?

  • Are there danger tags available? (i.e for tagging of defective equipment)

  • Have all double adaptors & piggy back plugs been excluded from site?

  • Are all portable GPO outlets weatherproof?

  • Are all flexible cords/leads positioned or protected to avoid damage?

  • Are all flexible cords/leads of a length less than or equal to those shown in the attached table?

  • Are all flexible cords/leads installed off the ground? (Note: cords/leads only to be placed on ground within switchyard areas)

  • Are all portable generators clearly labelled with earthing requirements?

AS/NZS 3012 – Construction Wiring Temporary Switchboards

  • Are all switchboards of robust construction and have a minimum <br>IP23 rating?<br>

  • Are all live parts of the switchboard effectively protected from direct contact?

  • Where GPO outlets are fitted, is there an insulated tie bar to prevent strain on cords/leads?

  • Is the switchboard securely fixed in position or on a design stable free standing structure?

  • Are all main switches and isolating switches accessible clearly marked (min of 6mm text) and capable of being locked in an open position?

  • Are all switchboards and sub circuits clearly marked via unique identifications marks?

  • Is the switchboard fitted with a lockable door? <br>The door shall;<br>• Fitted with a means to retain in the open position<br>• Fitted with a sign indicating “KEEP CLOSED - RUN ALL LEADS THROUGH BOTTOM”<br>• Not damage cords/leads when closed.<br>

  • Are all RCD’s and MCB’s covered and locked to prevent unauthorised access?

  • Are all sub-circuits protected by an RCD?

  • Is the construction wiring marked every 5 metres with yellow tape & the words “construction wiring”?

  • Is any aerial wiring across vehicle access points flagged 6m either side at 0.6m below the cable?

  • Is there a copy of the certificate of electrical safety for the temporary construction wiring?

  • Has the temporary construction wiring been visually inspected and tested by a qualified electrician within the last 6 months? (earth continuity and insulation resistance)

  • Are the roofs of all temporary buildings clear of temporary wiring?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.