Information

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

HSCP

  • Is a copy of the HSCP available at the site? Is the HSCP the correct revision, with the approval section completed?

  • Is the project scope in the HSCP correct?

  • Are all project specific rules being met in accordance with the HSCP?

Site Amenities

  • Are the following site based amenities being provided at the site?<br>A supply of cool, clean drinking water<br>Hand washing facilities<br>Dining facilities that include refrigerated food storage and facilities to enable the boiling of water<br>Toilets in accordance with the HSCP

Work Hours

  • Are work hours effectively being restricted to those outlined in the HSCP?

  • Have any out of hours work (including night works) been required at the site? If so, is evidence available of any necessary approvals?

Delegation of Responsibilities

  • Have two appropriate delegates been established for the PNS Site Manager? Are details of these nominated delegates displayed on the HSE Noticeboard or project pack, including names and contact details?

Signage

  • Is Principal Contractor signage clearly visible from outside the construction site, which indicates the PC name and phone number, and the location of the site office for the project?

  • Has all other signage relevant to the project (as outlined in the HSCP) been established at the site?

Remote or Isolated Work

  • Has the need for remote or isolated work been considered in the Project HSEQ Risk Assessment, and appropriate controls put in place?

Material / Product Non-Compliance

  • Has a designated quarantine area been established at the site? Is it clearly signed?

  • Are non-conforming tags (or out of service tags) available at the site?

Health and Safety Structure

  • Is the health and structure outlined in the HSCP correct?

Risk Management

  • Has a project risk assessment been completed for the project? Is a copy available at the site, and does it reflect the project specific risks with appropriate controls?

  • Is the JSEA process being undertaken in accordance with the HSCP?

  • Is the SWMS process being correctly undertaken?<br>Is evidence available of a monthly review process?<br>Have all workers who are doing work under the SWMS signed onto the document?

  • Has the Contractor SWMS Review Checklist been completed for all contractor SWMS in use at the site?<br>Were any issues identified on the checklist resolved, and has the checklist been signed?

Inductions

  • Is evidence available to demonstrate that all workers at the site have successfully completed the project online induction?

  • Is evidence available that all workers at the site have the relevant training/licenses for the work they are undertaking? Is there evidence of completion of the General Construction Induction Training for all workers at the site?

  • If applicable to the project requirements in the HSCP, is evidence available that all client inductions been completed?

  • Has the visitor induction process been undertaken at the site in accordance with the HSCP?

Emergency Preparedness and Response

  • Are all facilities required for emergency evacuation in place at the site? Is the air horn location signed? Is the muster point highlighted on the Site Layout Plan?

  • Has an evacuation drill been conducted in accordance with the HSCP? Were any actions identified resulting from the evacuation drill? Were those actions transferred to the project action register and closed out?

First Aid

  • Are all first aid facilities in accordance with the HSCP, including first aiders displayed on the HSE Board?d

Incident and Hazard Management

  • If any have occurred, have incidents been managed in accordance with the HSCP?

  • Is rehabilitation in accordance with the HSCP, and is the relevant poster displayed on the HSE Board?

  • Are hazards being reported at the site in accordance with the HSCP?

  • Is there a copy of the Powercor Incident Reporting and Investigation Manual on site?

Audits and Inspections

  • Have audits been completed in accordance with the requirements of the HSCP?

  • Are inspections being completed and actions recorded in accordance with the HSCP?

  • Are the processes associated with the actions register being undertaken in accordance with the HSCP, including tabling at monthly meetings and performance reports?

Performance Reporting

  • Is performance management and reporting occurring in accordance with the HSCP?

Consultation

  • Has a committee been requested at the site? If so, have the requirements of the HSCP been met?

  • Is a copy of the HSCP available at the site office? Is access to legislation etc. available upon request?

  • Have any changes at the site that may affect health and safety been adequately communicated?

High Risk Construction Activities

  • Vehicle/Mobile Plant Site Access and Movement: Are all vehicle and mobile plant movement requirements in the HSCP being met?<br><br>

  • Earthing of Mobile Plant and Equipment: Is earthing occurring in accordance with the HSCP?<br>

  • Plant and Equipment Register:<br>Has a Plant Hazard and Operation Inspection Checklist been completed for all plant and equipment at the site?<br>

  • Risk of Falls:<br>Have all requirements been met, including all risks of falls two metres or more assessed on a SWMS?<br>

  • Ladders:<br>Are all ladders on site non-conductive, heavy duty, tagged and inspected prior to use?<br>

  • Excavation Work:<br>Are all requirements in the WHSMP being met, including DBYD?<br>

  • Work in the Vicinity of Exposed Live Parts:<br>Are any exposed live parts present at the site? Have the requirements of the WHSMP been met?<br>

  • Confined Spaces and Enclosed Worksites:<br>Are any areas of the site considered confined spaces? If so, have the requirements of the HSCP been met?<br>

  • Asbestos:<br>Is any asbestos known to be at the site? If so, have the requirements of the WHSMP been met?<br>

  • Traffic Management:<br>Has the HSE Risk Assessment considered hazards associated with traffic movements? If so, has a traffic management plan been prepared and implemented?<br>

Hazardous Substances and Dangerous Goods

  • Is there an SDS Register at the site office? Does it meet all requirements of the HSCP?

  • Is any equipment at the site known, or suspected, to contain PCB’s? If so, refer to the requirements in the HSCP?

  • Are all hazardous substances and dangerous goods stored in labeled and secured containers, storage cabinets or cages?

Hot/Warm Work and Fire Prevention

  • Is the ground, in all areas of the site, completely clear of cigarette buts and matches?

  • Is hot work at the site being undertaken in accordance with the HSCP, including consideration of TFB days?

  • Is all warm work being undertaken in accordance with the HSCP?

  • Does the HSE Risk Assessment assess fire risk and minimum control requirements? Are the controls in place? Is equipment within test dates, and locations on the HSE Board or project pack?

PPE

  • Are the minimum PPE requirements outlined in the HSCP being met by all workers at the site?

Hazardous Manual Tasks

  • Have the requirements outlined in the HSCP been applied to all tasks involving manual handling?

Temporary Barriers

  • Are barriers in place in all areas, and meeting the requirements stipulated in the HSCP?

Tools and Equipment

  • Is all PETE at the site on a register and either within test date or located in the quarantine area?

  • Inspection Measuring and Test Equipment: Is all equipment being managed in accordance with the HSCP?

  • Lifting Equipment: Is all equipment being managed in accordance with the HSCP?

Temporary Construction Wiring

  • Is all temporary construction wiring in accordance with the WHSMP, in particular the use of flexible leads?

Earthing Requirements

  • Has work occurred in accordance with the requirements of the HSCP?

Work Conditions

  • Has noise monitoring been undertaken in accordance with the HSCP?

  • Is a copy of the Safety Manual available for reference in the event of inclement weather?

Smoking in the Workplace

  • Is smoking on site being limited to the designated smoking areas (if any)?

Drugs and Alcohol

  • Are the requirements of the HSCP being met?

Appendices

  • Are all appendices relevant to the project, and where applicable, up to date?

Policy

  • Is a copy of the Environmental Policy on the Site HSE Notice board or in the project pack?

CEMP

  • Is there a copy of the CEMP at the site?

  • Is the organisational structure in the CEMP correct?

  • Is there a copy of the Environmental Contacts on the HSE Notice board or in the project pack?

  • Is there a copy of the Site Environmental Plan on the HSE Notice board or in the project pack?

  • Is there a copy of Environmental Controls on the HSE Notice board or in the project pack?

Environmental Inspections

  • Are there hard copies of environmental inspections completed in accordance with the CEMP?

Waste Management

  • Is the Waste Disposal Register up to date, and waste transport certificates available?

  • Are there suitable bins available on site for the storage, recycling and removal of solid wastes?

  • Are there suitable bins available on site for the storage, recycling and removal of solid wastes?

Spill Management

  • Is there a spill kit (with the capacity to clean up the volume of fuel/chemicals stored on site) available within 10 metres of all chemical or fuel storage areas?

  • Is there a plant and vehicle refuelling area available with appropriate bunding and spill controls in place, or are portable bunds on site for refuelling?

Sediment Control

  • Are appropriate controls in place to control sediment run off from the site?

  • Are all soil stockpiles being stored a minimum of 10 metres from any drain or waterway, and adequately protected from wind?

  • Is there adequate sediment control around soil stockpiles?

Pests and Weeds

  • Are all vehicles and items of plant entering the site being inspected for the presence of excess dirt and weeds?

  • Is the origin of all imported fill known, and if not, has it been inspected and tested for contaminants prior to being delivered to site?

  • Are pest plants being identified and removed from site in an appropriate manner to prevent spreading of pest plants?

Air Quality

  • Are all vehicles and machinery engines switched off when not in use?

  • Are appropriate controls in place to control excess dust being emitted from the site?

  • Where access tracks may become dusty, are sprinklers available to keep tracks damp, or other appropriate controls in place to prevent dust in accordance with CEMP?

Noise

  • Are working hours being effectively restricted to the allowed working hours, where the activities are expected to cause construction noise?

Flora and Fauna

  • Is all vegetation removal in accordance with the CEMP, and the associated approval documentation (planning permit, REF etc.)?

  • Are work site controls such as hygiene, waste management and fencing implemented to prevent animals becoming a pest during construction?

CEMP Specific

  • Are all project specific requirements in accordance with the CEMP?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.