Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1. Works Planning
-
1.0 What is the methodology that dictates the work which is chosen to be completed after review of yearly total and monthly forecasted units?
-
1.1 How is work planned & programmed in regards to risks and network impacts?
-
1.2 What systems and or process manage training and authorisations?
-
1.3 Provide evidence of planning communications with related 3rd parties; councils, Vic roads, Telstra, MOCS, other distribution businesses etc.?
-
1.4 Provide evidence that work schedules are provided in a timely fashion for network outage/augmentation planning? (e.g. NCC and customer notifications)
-
1.5 Is the order setup correctly to capture MAT code costs
2. Works Packaging
-
2.0 Provide evidence of a work folder checklist: (Work Activity Record, Job Safety Assessment Maintenance Instruction etc.)
-
2.1 Provide evidence of how work packages are prioritised?
-
2.2 Is there evidence that process, network and HSE risks identified in the works planning stage are mitigated?
-
2.3 Are there any packaging efficiencies adopted to ensure customer and network outages are minimised?
-
2.4 How does the service provider confirm if work crew have enough time to complete the works package in the timeframe assigned?
-
2.5 How are other related works identified such as opportunistic maintenance items?
3. Works Management System
-
3.0 What system is used to manage the tracking of the life of the work order?
-
3.1 How are works issued to supervisors?
-
3.2 How does the supervisor know the due date?
-
3.3 Is there any contingency built into the planned date?
-
3.4 Once work is programmed, how is the program date logged?
-
3.5 Who reviews the system to ensure works are programmed by the due date?
-
3.6 Who reviews the system to ensure once the works planned date has lapsed, that the folder has been returned?
-
3.7 What is the process for the works folder when returned back to the maintenance planning team?
-
3.8 What is the timeline / process for closing all notifications?
4. Works Cancellations
-
4.0 If works are cancelled for any reason, what is the process for re-programming?
-
4.1 How are cancelled works managed so they do not index prior to the next program date?
-
4.2 Are the cancelled works logged into a system for review and continuous improvement identification?
-
4.3 How is the asset owner informed of cancelled works that have exceeded their due date
5. Works Delivery
-
5.0 Evidence of system/process, which ensures the supervisor confirms that tasks are completed safely, as required and that work practices & instructions are adhered to?
-
5.1 Evidence of works completion to schedule?
-
5.2 Evidence a post construction/maintenance audit is completed by the service provider to ensure compliance to design standards.
-
5.3 Evidence of a document control system which includes the preparation, review, approval, issue, distribution, revision, cancellation and appropriate storage/archiving?
-
5.4 Evidence that Job Safety Assessments are completed by all workers?
-
5.5 Evidence that works data is returned promptly on completion? (e.g.; files, DIS sheets, pole status reports, clearances, permits, as built drawings, SAP, toolbox meeting notes etc.)
-
5.6 Evidence of records management in accordance with legislative requirements?
6. Works Closeout
-
6.0 Evidence that work completed and post work audit results are analysed, trends identified, and follow up actions completed?
-
6.1 What process is followed for system updates due to job closeout to ensure accurate changes in GIS, SAP, drawings, protection settings etc.
-
6.2 How are costs managed and units validated in terms of claims?
-
6.3 Evidence that risk assessments are reviewed by management & re-assess as required?
-
6.4 Evidence that new/updated operational procedures/work instructions undergo risk assessment prior to adoption?
-
6.5 Evidence that job planning processes are reviewed to assess process improvements?
-
6.6 Provide evidence of accurate cost allocation.