Title Page
-
Conducted on
-
Start-up coordinator Quality:
-
Start-up coordinator Production:
-
Start-up Engineer:
-
Product Name:
-
Customer
-
Any outstanding information we are waiting for:
-
f.eg.:
Pre Line start-up checks
-
Line drawing available?
-
Engineer set-up ready/ trial completed?
-
All machinery been checked if working correctly?
-
Is there any CCP available on the line?
-
Metal Detector?
-
Check if the correct metal pieces are being used and correct procedure being followed.
-
-
Sieving?
-
Is the sieve intact and correct procedure being followed?
-
Air Blower?
-
Check if it's cleaning the contaminated jar and correct procedure being followed.
-
QAS supplied by the customer?
-
Labels approved?
-
Make a picture of all required labels:
-
Program for bagger uploaded?
-
Job Bag completed with all info and signed on front page?
-
Customer specification, emails reviewed?
-
Packing area organised and clean?
-
T/L fully understands the job bag and the process steps
Line Start-up
-
Quality of the stock
-
Packaging version/product code correct:
-
Bag/flow wrap length correct:
-
Record the length:
-
Record the length:
-
Mix of stock, weight or box count correct?
-
Record it:
Completed unit
-
BB date and Lot code format correct:
-
Make a picture:
-
Orientation of stock in the pack if more than 1 component
-
Make a picture:
-
Seal checked on finished pack:
-
Quality of the print (on bag, label or carton)
-
Light Pack required?
-
Record the weight
-
Tare pack required?
-
Record the weight:
-
Weight of finished stock (if applicable)
-
Tamper seal placement/length (if applicable)
-
Record average from CW or scales in first 15 min (if applicable)
Finished goods
-
Stock checked for damage after packing
-
Outer case tape (not covering perf and has correct colour/length)
-
Pallet plan correct
-
Take a picture:
-
Orientation of stock in outer
-
Make a picture:
-
Count in the box?
-
How many?
-
Average weight being used?
-
Record it
-
Photos taken for QAS/ Samples left on line?
-
Case of finished good checked?
-
What wasn't right?
-
Check 2 cases of finished good after 1 hour. Record time here:
General
-
Samples collected and checked before release:
-
Gold seal sample collected
-
First day production sheets checked
-
Internal QAS created?
-
H&S noise levels checked? Record here:
-
Any other concerns?
-
What is that?