Title Page

  • Conducted on

  • Start-up coordinator Quality:

  • Start-up coordinator Production:

  • Start-up Engineer:

  • Product Name:

  • Customer

  • Any outstanding information we are waiting for:

  • f.eg.:

Pre Line start-up checks

  • Line drawing available?

  • Engineer set-up ready/ trial completed?

  • All machinery been checked if working correctly?

  • Is there any CCP available on the line?

  • Metal Detector?

  • Check if the correct metal pieces are being used and correct procedure being followed.

  • Sieving?

  • Is the sieve intact and correct procedure being followed?

  • Air Blower?

  • Check if it's cleaning the contaminated jar and correct procedure being followed.

  • QAS supplied by the customer?

  • Labels approved?

  • Make a picture of all required labels:

  • Program for bagger uploaded?

  • Job Bag completed with all info and signed on front page?

  • Customer specification, emails reviewed?

  • Packing area organised and clean?

  • T/L fully understands the job bag and the process steps

Line Start-up

  • Quality of the stock

  • Packaging version/product code correct:

  • Bag/flow wrap length correct:

  • Record the length:

  • Record the length:

  • Mix of stock, weight or box count correct?

  • Record it:

Completed unit

  • BB date and Lot code format correct:

  • Make a picture:

  • Orientation of stock in the pack if more than 1 component

  • Make a picture:

  • Seal checked on finished pack:

  • Quality of the print (on bag, label or carton)

  • Light Pack required?

  • Record the weight

  • Tare pack required?

  • Record the weight:

  • Weight of finished stock (if applicable)

  • Tamper seal placement/length (if applicable)

  • Record average from CW or scales in first 15 min (if applicable)

Finished goods

  • Stock checked for damage after packing

  • Outer case tape (not covering perf and has correct colour/length)

  • Pallet plan correct

  • Take a picture:

  • Orientation of stock in outer

  • Make a picture:

  • Count in the box?

  • How many?

  • Average weight being used?

  • Record it

  • Photos taken for QAS/ Samples left on line?

  • Case of finished good checked?

  • What wasn't right?

  • Check 2 cases of finished good after 1 hour. Record time here:

General

  • Samples collected and checked before release:

  • Gold seal sample collected

  • First day production sheets checked

  • Internal QAS created?

  • H&S noise levels checked? Record here:

  • Any other concerns?

  • What is that?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.