Preliminary Checks
-
Ensure all connections are tight
-
Ensure fuses installed correctly
-
Ensure contractors have free movement
-
Ensure discharge resistors have not been damaged
-
Ensure correct phase rotation to PFC
-
Ensure CT is connected to L1
-
Ensure voltage is 400V +- 10%
-
Remove CT short Links
-
Program CT Ratio
-
Check Settings and alarm functions are at default
Commissioning Details
-
Target PF
-
Switching Delay
-
CT Current Present at controller?
-
Confirmed Phase Rotation
-
Turn off Unused Steps
Step Details
-
Step Testing
Step
-
L1 Current
-
L2 Current
-
L3 Current
-
Current Test OK?
Preliminary Checks
-
Ensure all connections are tight
-
Ensure fuses installed correctly
-
Ensure contractors have free movement
-
Ensure discharge resistors have not been damaged
-
Ensure correct phase rotation to PFC
-
Ensure CT is connected to L1
-
Ensure voltage is 400V +- 10%
-
Remove CT short Links
-
Program CT Ratio
-
Check Settings and alarm functions are at default