Guidance: Site Management must use this Permit to Work when electrical works on live services is required to be isolated/ locked off so that no persons are subject to electrical risks. A copy of this document should be used as a working document on site and kept on site for the duration of the project in the site safety file. Support documentation is contained in Part two of the Policy for further guidance.

Section A: Equipment to be worked on

Section B: Works to be carried out

Section C: Safety precautions taken

The above isolation points are fitted with safety locks and the keys held by the Authorised Person

  • Name:

  • Position:

The following tests have been carried out to confirm that the equipment listed in Part A is dead

Access barriers and warning notices have been provided as follows:

The following additional precautions have been taken:

I (being the Competent Person) confirm that a Risk Assessment has been carried out and the associated Safe Method of Work Statement has been given to the electricians. All Electricians are fully competent in the work involved and only the work detailed in Part B will take place.

  • Name:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.