Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location
  • Weather

General Inspection

  • General Site Conditions

  • Recommended Actions

  • Is the system powered on?

  • Describe system condition

  • Is the inverter indicating any ground faults or other error messages?

  • error code

  • Type of mounting system

  • Confirm presence of product documentation

Modules

  • Visually inspect for damage, dirt or dust accumulations

  • Check for shading

  • Results of module hand lift test

  • Describe results

Racking System

  • Visually inspect connections

  • Violations found?

  • Describe violations

  • Are footings, support structure, and all penetrations sufficiently flashed and waterproofed?

  • Inverters
  • Visually inspect for damage

  • Clean out interior

  • Are there air filters?

  • Did you clean them?

  • Are there fuses in the inverter?

  • Spare Fuses onsite

  • Recommend ordering replacement

  • Did you check all fuses for continuity?

  • Why not?

  • Check connections for proper torque

  • Describe actions taken

Module to Module Wiring

  • Visually inspect wiring

  • Violations Found?

  • Describe Violations

  • Violations Repaired Onsite?

  • Recommended Actions

  • Visually Inspect Connectors

  • Describe Findings

  • Spot check several module connectors for oxidation

  • Action Required

  • Repaired onsite?

  • Recommended Actions

  • DC/AC Combiners and Disconnects
  • Visually Inspect for damage

  • Clean out interior

  • Check all fuses

  • replace as required

  • Fuses available onsite?

  • Check Connections

  • Re-torque as needed

Monitoring

  • Does System have remote monitoring?

  • What type of monitoring does it have?

  • Do we have log in access to it?

  • What is the password?

  • What type of devices does the system have? (i.e. irradiance sensor, temp sensor, etc.)

  • Are devices operating and in good condition?

  • explain

Point of Solar System Interconnection

  • Electrical Concerns or Code Violations?

  • Inspect ground connection, retorque as needed

  • Check for cable conditions

  • Check cable terminals for burnt marks, hot spots, or loose conditions

  • Check for physical damage

Conduit and Wiring

  • Visually inspect all conduit and connections

  • Can repairs be made at visit?

  • Describe required actions

  • All conduit penetrations and roof safety anchors properly sealed with exterior grade sealant?

  • All roof mounted junction boxes, combiners securely installed?

  • Are conduit supports rated for the installation and properly installed?

  • Are conductors loose, touching roof surface or in contact with sharp or abrasive surfaces?

  • Are any conductors exposed to UV?

Thermal Imaging

  • Point of Interconnection

  • Inverters

  • AC/DC Combiner Panels

  • Disconnects

  • Misc.

Electrical Performance Test

Strings

  • Record time and ambient temperature

  • Perform and record Open Circuit Voltage Test (Voc) on all strings

  • Perform and record Maximum Power Current Test (Imp) on all strings

  • Record Irradiance on every string

Inverter

  • Perform and record anti islanding test

  • Test results documented?

  • Record inverter operating parameters:

  • DC input parameter

  • AC output parameter

  • Faults recorded?

General Comments

  • undefined

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.