Hazard classification key
(A) Serious rectify immediately
(B) Hazardous program rectification
(C) Satisfactory as it is
N/A Not Applicable
GENERAL
-
Subcontractors Inducted
-
New Employees Inducted
-
PMP/Standard Drawings on site
-
Emergency Numbers Displayed
-
Safe Work Procedures Followed
-
Day Sheets Filled Out
AMENITIES
-
Compound safe and secure
-
Good house keeping - compound and site
-
Toilet clean and in good condition
-
Amenities adequate for project
-
Container & tool store satisfactory
FIRST AID
-
First aid kit & facilities on site
-
First aid officer nominated
PERSONAL PROTECTIVE EQUIPMENT
-
Hearing protection available
-
Safety footwear being worn
-
Hard hats worn where required
-
Safety vests worn if required
-
Eye and sun protection available
EXCAVATION/PIPE LAYING
-
Trenching/pipe laying practice ok
-
Ground support trench > 1.5m details
-
Mine manager on site & nominated
-
Lookout on top all times > 1.5m
-
Barricade in place for open trench
-
Materials stored correctly
-
Defect materials isolated
-
Material record sheet filled out
PLANT & EQUIPMENT
-
Waste oil & other waste collected
-
Daily plant inspections and fault reports completed for all plant
-
Subcontractors plant in good condition and inspected daily
-
Operators have tickets of competency
-
Vehicles parked to reduce impact on road users and pedestrians
-
Electric leads inspected and tagged
-
Power and hand tools in good condition
-
Lifting equipment in good condition
SITE SAFETY
-
SWMS in PMP used
-
Warning signs, traffic and public in place as per TMP
-
Toolbox meeting minutes kept on site
-
Inspect for dangerous goods
-
MSDS sheets on site if needed
-
Work practices inspected for any other potential hazards on site
-
Potential for confined space hazard
-
Warning signs stacked and clean
-
SWMS have been checked and are relevant to work being undertaken
-
Existing services located
-
Appropriate lighting for night work
ENVIRONMENT MANAGEMENT
-
Environmental analysis in PMP being used
-
Inspect for extra environmental hazards
-
Erosion control arranged
-
Sedimentation control arranged
-
Clearing works limited to site only
-
Control measures monitored
-
General comments:
-
Non-conformance/suggestion report form and copy of report given to safety co-ordinator?
-