Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Hazard classification key
    (A) Serious rectify immediately
    (B) Hazardous program rectification
    (C) Satisfactory as it is
    N/A Not Applicable

    no label

GENERAL

  • Subcontractors Inducted

  • New Employees Inducted

  • PMP/Standard Drawings on site

  • Emergency Numbers Displayed

  • Safe Work Procedures Followed

  • Day Sheets Filled Out

AMENITIES

  • Compound safe and secure

  • Good house keeping - compound and site

  • Toilet clean and in good condition

  • Amenities adequate for project

  • Container & tool store satisfactory

FIRST AID

  • First aid kit & facilities on site

  • First aid officer nominated

PERSONAL PROTECTIVE EQUIPMENT

  • Hearing protection available

  • Safety footwear being worn

  • Hard hats worn where required

  • Safety vests worn if required

  • Eye and sun protection available

EXCAVATION/PIPE LAYING

  • Trenching/pipe laying practice ok

  • Ground support trench > 1.5m details

  • Mine manager on site & nominated

  • Lookout on top all times > 1.5m

  • Barricade in place for open trench

  • Materials stored correctly

  • Defect materials isolated

  • Material record sheet filled out

PLANT & EQUIPMENT

  • Waste oil & other waste collected

  • Daily plant inspections and fault reports completed for all plant

  • Subcontractors plant in good condition and inspected daily

  • Operators have tickets of competency

  • Vehicles parked to reduce impact on road users and pedestrians

  • Electric leads inspected and tagged

  • Power and hand tools in good condition

  • Lifting equipment in good condition

SITE SAFETY

  • SWMS in PMP used

  • Warning signs, traffic and public in place as per TMP

  • Toolbox meeting minutes kept on site

  • Inspect for dangerous goods

  • MSDS sheets on site if needed

  • Work practices inspected for any other potential hazards on site

  • Potential for confined space hazard

  • Warning signs stacked and clean

  • SWMS have been checked and are relevant to work being undertaken

  • Existing services located

  • Appropriate lighting for night work

ENVIRONMENT MANAGEMENT

  • Environmental analysis in PMP being used

  • Inspect for extra environmental hazards

  • Erosion control arranged

  • Sedimentation control arranged

  • Clearing works limited to site only

  • Control measures monitored

  • General comments:

  • Non-conformance/suggestion report form and copy of report given to safety co-ordinator?

  • Signature:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.