Information

  • Document No.

  • Audit Title

  • Client / Site (displayed on first page)

  • Conducted on

  • Prepared by

More than one auditor?

  • Additional auditor

  • PRA, JSEA or SWMS is completed for the task

  • Method of hazard identification & risk assessment is suitable (PRA, JSEA, SWMS)

  • JSEA development was a group activity, completed by all persons involved in the task and approved (signature) by the Supervisor

  • JSEA reviewed and signed on to by all persons invovled in the task

  • JSEA / SWMS includes all step tasks involved in the activity

  • Specific controls are identified in the JSEA / SWMS in accordance with the hierachy of control

  • Controls are adequate to allow the task to be performed in a safe manner

  • Correct tools and equipment are identified in the JSEA and are being used

  • Emergency response measures are identified in the JSEA / SWMS

  • SWMS / JSEA is located at the work site

  • SWMS / JSEA is modified and approved when tasks or conditions change

  • SWMS / JSEA identifes permit requirments (if applicable)

  • Observations indicate the SWMS / JSEA is being followed

  • Noise mitigation and attenuation measures in place for plant and equipment to limit construction noise (EMP PDS 2)

  • Dust prevention is identified as a priority within pre-start meetings, JSEA's and task planning (EMP PDS 4)

  • Action required?
  • Action

  • Allocated to

  • Action due

  • Signed PoMC Representative:

  • Signed Principal Contractor Representative (optional):

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.