Information
-
Document No.
-
Audit Title
-
Client / Site (displayed on first page)
-
Conducted on
-
Prepared by
More than one auditor?
-
Additional auditor
-
PRA, JSEA or SWMS is completed for the task
-
Method of hazard identification & risk assessment is suitable (PRA, JSEA, SWMS)
-
JSEA development was a group activity, completed by all persons involved in the task and approved (signature) by the Supervisor
-
JSEA reviewed and signed on to by all persons invovled in the task
-
JSEA / SWMS includes all step tasks involved in the activity
-
Specific controls are identified in the JSEA / SWMS in accordance with the hierachy of control
-
Controls are adequate to allow the task to be performed in a safe manner
-
Correct tools and equipment are identified in the JSEA and are being used
-
Emergency response measures are identified in the JSEA / SWMS
-
SWMS / JSEA is located at the work site
-
SWMS / JSEA is modified and approved when tasks or conditions change
-
SWMS / JSEA identifes permit requirments (if applicable)
-
Observations indicate the SWMS / JSEA is being followed
-
Noise mitigation and attenuation measures in place for plant and equipment to limit construction noise (EMP PDS 2)
-
Dust prevention is identified as a priority within pre-start meetings, JSEA's and task planning (EMP PDS 4)
Action required?
-
Action
-
Allocated to
-
Action due
-
Signed PoMC Representative:
-
Signed Principal Contractor Representative (optional):