Information
-
Document No.
-
Audit Title
-
Client / Site (displayed on first page)
-
Conducted on
-
Prepared by
More than one auditor?
-
Additional auditor
-
S.T.A.R.T Card completed (shall be used at the beginning of every shift and prior to starting any new task in the course of a shift)
-
Person conducting this inspection has signed on to the individuals/ work groups' S.T.A.R.T Card
-
Members of the McConnell Dowell management teams have been performing task safety observations - "Safe talks"
-
Person conducting this inspection has conducted a "Safe Talk" during this inspection (or at the end)
-
Method of hazard identification & risk assessment is suitable (S.T.A.R.T Card, JSEA/SWMS)
-
JSEA/SWMS development was a group activity, completed by all persons involved in the task and approved (signature) by the Supervisor (verify with workers)
-
The work team carrying out the work have been informed of the requirements of the JSEA/SWMS prior to starting work (verify with workers)
-
JSEA reviewed daily and signed on to by all persons invovled in the task
-
JSEA / SWMS includes all step tasks involved in the activity
-
Controls are adequate (in the view of the person conducting the inspection) to allow the task to be performed in a safe manner
-
Correct tools and equipment are identified in the JSEA and are being used
-
Identified hazards have been clearly expressed/defined in the JSEA/SWMS
-
Risk assessments appear consistent with the hazards in the JSEA/SWMS
-
Control measures are consistent with the hierarchy of controls philosophy in the JSEA / SWMS
-
Appropriate contingency plans exist in the event of an emergency
-
The JSEA/SWMS includes environmental hazard identification, risk assessment and control measures
-
SWMS / JSEA is located at the work site
-
Any changes in the work method have been documented on the JSEA/SWMS and each team member signed the JSEA/SWMS Confirming their acknowledgement of the change
-
SWMS / JSEA identifes permit requirments (if applicable)
-
Observations indicate the SWMS / JSEA is being followed (verify/ question workers on some of the control measures listed in the JSEA/SWMS)
-
McConnell Dowell 'See, Say, Do' report forms are being utilised by workers for the reporting of hazards
-
All hazards noted on Hazard Report forms are recorded in the site action Commitment Register to ensure close-out of any further actions identified
-
Noise mitigation and attenuation measures in place for plant and equipment to limit construction noise (EMP PDS 2)
-
Dust prevention is identified as a priority within pre-start meetings, JSEA's and task planning (EMP PDS 4)
Action required?
-
Action
-
Allocated to
-
Action due
-
Add location
-
Signed PoMC Representative:
-
Signed Principal Contractor Representative (optional):