Exclusion zones established, physically identified and maintained to prevent persons entering piling areas(including exclusion around the crane counterweight, outriggers and pile pitching zone)
-
Side loading on the boom and side dragging of piles is avoided when a pile is being pitched in position for driving
-
For any works below the drop hammer, the hammer is lowered onto the positively locked safety system and the crane hoist mechanism is be locked out (lock out/ tag out permit)
-
The drop hammer is not snatching or catching
-
The hoist rope is not being jerked or the crane tipped during pile extraction
-
Limiting and indicating devices are fitted to mobile cranes used for pile extraction
-
The additional mass of the equipment used in piling and the loads arising during operation do not overload the crane, boom or jib structure
-
The stability of the crane has been verified and is not adversely affected by the additional mass of piling equipment (e.g. Minimum area required under outrigger foot = 0.65 x (total crane mass + lifted load) divided by pressure applied by outrigger feet)
-
Ropes on sheaves and on drums, rope terminal fittings and rope anchorages (pile driving and pile extraction) inspected and not damaged
-
Inspecting person to verify: where a drop hammer is used on a crane mounted on a barge or other floating plant, the release of the hammer produces a reaction on the vessel, which should be taken into account when considering the stability of the combined unit
-
A risk assessment has been facilitated for any pile excavation works
-
A SWMS/ JSEA is in place for all piling works
-
The piling noise levels consistent with the Desktop Noise Assessment