  • Signage and delineation at entrance to work area erected

  • Condition of internal roads maintained to acceptable standard

  • Are heavy vehicle parking areas in place (e.g. Go lines, windrows)

  • All vehicles fitted with flashing rotating amber beacons

  • Earthmoving equipment using correct radio communication

  • Pre-Start inspection of the work area (and mobile plant) conducted

  • Any trenches >1.5 metres are protected from collapse by way of shoring, benching or battering

  • Hard barricading and signage is in place around all open trenches

  • If persons are working in a trench, the is effective and adequate means of entry and exit and the risk of engulfment has been assessed in the SWMS

  • Current Permits / Certificates in place for the earthworks (Eg: ground penetration)

  • Is the disturbance boundary fence clearly marked and maintained (Eg: Salt Marsh area, no-go areas)?

  • Are internal road intersections clearly sign posted?

  • Are Traffic Management plans / Traffic Movement Plans current?

  • Are contractor employees trained in / familiar with their Traffic Management / Movement Plan?

  • Are Safe Work Method Statements in place for earthmoving activities involving mobile plant?

  • Noise mitigation and attenuation measures in place for plant and equipment to limit construction noise (EMP PDS 2)

  • Dust prevention is identified as a priority within pre-start meetings, JSEA's and task planning (EMP PDS 4)

  • Measures are in place for effective dust management and suppression (EMP PDS 4)

  • Bunds are in place for mechanical equipment (fuel-powered) such as generators, pumps and fuel trailers. (EMP PDS 9)

  • Oil spill response kits stocked and located in appropriate areas and staff trained in their use. (EMP PDS 10)

  • Employees/Supervisors aware of process to be followed if a potential heritage or Aboriginal site identified (EMP PDS 11)

  • Stormwater / Groundwater Management Plan is being followed and measures in place to contain and manage discharges (EMP PDS 12)

  • Decommissioned landfill site delineated on site plans. No trenching of the pre-existing capping layer in this area. (EMP PDS 13)

  • Procedures in place to manage bulk earthworks and acceptance and relocation of soil throughout site. (EMP PDS 14)

  • Inert waste streams are being segregated and appropriately managed (EMP PDS 14)

  • Odorous/stained soils have been stockpiled, labelled, bunded and appropriate testing and management has been in accordance with the Soil Management Plan. (EMP PDS 14)

  • Actions required?
  • Action?

  • Allocated to?

  • By date

  • Add location
  • Signed PoMC Representative:

  • Signed Principal Contractor Representative (optional):

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.