Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Is the area demarcated?
- Yes
- No
- N/A
-
Add media
-
Are the Windrows in place?
- Yes
- No
- N/A
-
Add media
-
All vehicular movement within the barricaded blast area must be approved by the responsible Miner in Charge of the bench.
- Yes
- No
- N/A
-
Add media
-
Drill prep performed to standard?
- Yes
- No
- N/A
-
Add media
-
Traffic management plan available?
- Yes
- No
- N/A
-
Add media
-
Traffic management plan being followed?
- Yes
- No
- N/A
-
Add media
-
Holes prepared?
- Yes
- No
- N/A
-
Add media
-
Water used during drilling?
- Yes
- No
- N/A
-
Add media
-
Holes damaged by drill?
- Yes
- No
- N/A
-
Add media
-
Holes damaged by vehicle?
- Yes
- No
- N/A
-
Add media
-
Miner in Charge aware of holes that have been damaged and actions put in place to attempt to rectify/follow up/discipline?
- Yes
- No
- N/A
-
Add media
-
Miner in charge has notified the D&B Section Manager of any hole damages incurred during the shift?
- Yes
- No
- N/A
-
Add media
-
Hole savers used?
- Yes
- No
- N/A
-
Add media
-
Ensure sufficient hole savers or gas bags are available in the blast area for use in protecting holes where required?
- Yes
- No
- N/A
-
Add media
-
Loading plan available?
- Yes
- No
- N/A
-
Add media
-
Loading plan being followed?
- Yes
- No
- N/A
-
Add media
-
Loading into water?
- Yes
- No
- N/A
-
Add media
-
Spotter being used for manoeuvring on bench?
- Yes
- No
- N/A
-
Add media
-
Spotter is fully aware of and fulfilling their expected duties and task outcomes?
- Yes
- No
- N/A
-
Add media
-
Ensure the leads have been secured in a tidy fashion at the blast hole collar?
- Yes
- No
- N/A
-
Add media
-
Are Dets and Boosters deployed in a safe area adjacent to blast hole?
- Yes
- No
- N/A
-
Add media
-
Correct dip data available?
- Yes
- No
- N/A
-
Add media
-
Effort being made to load/clean damaged holes?
- Yes
- No
- N/A
-
Add media
-
Stemming used?
- Yes
- No
- N/A
-
Add media
-
The charging and stemming sequence of the blast should be planned to avoid having to drive vehicles over charged or primed holes
- Yes
- No
- N/A
-
Add media
-
Loading area blocked off at the end of the day to prevent inadvertent access to bench?
- Yes
- No
- N/A
-
Add media