Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
1.0 Palletising
-
11.1 Any Evidence of water/condensate - pooling, leaking, in relevant areas
-
11.2 Any FM risks, i.e Lighting, signage, powder, rubber, metal, cardboard, wood
-
11.3 Tools and Equipment - in good condition and stored correctly
-
11.4 Building Integrity for Floors, Walls, Ceilings - cracks, vinyl
-
11.5 Pests - any evidence of pest/insect activity and controls that are in place are working i.e Fly traps
-
11.6 Brushes and Brooms - stored correctly and in good condition according to photo standard
-
11.7 General cleaniness and tidiness - i.e Staining from water, powder, cleaning, rust - on floor, walls, paint
-
11.8 Doors - Ensure inside door frames are inspected and cleaned if required
-
11.9 Packing Roof Areas clean and free from powder build up
-
11.10 Fines Collection Area and Levels clean and free from powder build up
-
Comments/ actions required....
-
Insert relevant photos
12.0 Summary of Inspection
-
Any additional items not covered in the 5S Inspection:
-
Insert relevant photos
-
The findings of this 5S Inspection were presented to, and discussed with the Process manager on this date:
-
Name and Signature of Team Leader
-
Name and Signature of Process Manager