Title Page

  • Site conducted

  • Conducted on

  • Conducted by:

  • VRM

  • Fleet Number

  • ODO Reading

  • Lift Make

  • Lift Model

  • Lift Serial Number

  • SWL

Six Month LOLER Inspection

  • 1, Remove beam or ram cover (refit)

  • 2, Check ram(s) - Leaks & operation

  • 3, Check power pack - Leads and operation

  • 4, Check all hydraulic valves

  • 5, Check Pipes and Hoses - Leaks and condition

  • 6, Check banjo and couplings - Leaks

  • 7, Check safety catch - wear and condition

  • 8, Check safety gates

  • 9, Check runner bearings

  • 10, Check pivot pins & shaft - Alignment and wear

  • 11, Check guide rollers (tuck away)

  • 12, Check platform alignment with floor

  • 13, Check stow lock device - wear and condition

  • 14, Check L.S.D of C.F.D - Operation

  • 15, Check stow gaurd - Security and clearance

  • 16, Check platform rubber buffer - wear/security

  • 17, Check platform anti-tilt device - Operation

  • 18, Check loading ramp - wear

  • 19, Check platform wear and condition

  • 20, Check all welds - Cracks and condition

  • 21, Check int/ext control box - condition and security

  • 22, Check isolator and limit switches - condition

  • 23, Check wander lead - Operation and condition

  • 24, Check wiring and main cables - Security and condition

  • 25, Check power pack mounting - Security

  • 26, Check inline fuse/holder - Condition

  • 27, Check operation sticker - Fitted, visible and clear.

  • 28, Check marker light/flag - Operation and condition

  • 29, Check circuit boards - Security/operation

  • 30, Other

LOLER Declaration

  • This equipment is now of a satisfactory standard and is fully functional for service

  • This equipment has not been fully repaired and the following action must be taken

  • Apply an immediate repair to allow a safe operation of unit

  • Remove the unit from service until repair has been effected

  • Continue to use equipment. Repair at next service plan

  • Pass or Fail LOLER check?

  • I certify that the passenger lift was thoroughly examined on the above date and that subject to any remedial action noted is safe to operate. Engineers signature

  • Date of examination

  • Date of next examination

Weight Test Certificate

  • Safe Working Load (KG)

  • Downward creep in 10 minutes (MM)

  • Operation time in SWL UP (seconds)

  • Operation tome in SWL DOWN (seconds)

Declaration

  • I Certify on this date the above equipment was tested.

  • Date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.