Title Page
-
Site conducted
-
Conducted on
-
Prepared by
Documentation On Site
-
Inductions training carried out
-
CSCS & CPCS Cards Checked
-
RAMS Briefed & Implemented
-
Are RAMS up to date to the ongoing works?
-
LOLER & PUWER Register Completed
-
Permits Issued
-
Health & Safety Toolbox Talks
-
Environmental Toolbox Talks
-
Waste Transfer Notes, Carriers Licence and Relevant Permits
Welfare Facilities
-
Office / Canteen
-
First Aid Facilities
-
Protective Clothing
Housekeeping
-
Skips in Position and Used Correctly
-
Materials Storage
-
Wheel Wash
-
Concrete Wash out
-
Drip Trays
-
Dry / Dusty / Muddy
Health Hazards
-
Vibration
-
Noise
-
Chemical
-
Contaminated Land
-
Concrete
-
COSHH Assessments Available
Plant
-
Transport plan on display
-
Pedestrian segregation in Operation
-
Speed Restrictions in Operation
-
Plant Inspection being Carried Out
-
Fuel Bowser condition and Spill kit
Lifting Operation
-
Certs of Inspection (12 and 6 Monthly )
-
Lifting Plan on Site
-
Crane Operator Competent
-
Banksman / Slinger Competent
Emergency Proceedures
-
Fire Precautions / Equipment
-
Operatives trained in event of spillage
Excavations
-
Excavations Open
-
Ground Disturbance Permit Issue
-
Services detection carried out
-
Services identified & position indicated
-
Ground Support system in operation
-
Edge Protection/Fencing in Position
-
Access / Egress
-
7 Day Inspection Carried out
Working at Heights
-
Fencing / Hand Rails
-
Ladders in Use
-
Tower Scaffold
-
Independent Scaffold
-
Harnesses
-
7 Day Inspection Carried Out
Water
-
Surface Water
-
Recycled
-
Leakages
-
Water Course Contaminations
Issues
-
Problem found and actions to be taken to rectify.
-
Manager Signature