Title Page
-
Site
-
Permit Number
-
Permit Completed By:
-
Permit Issued To (Responsible Person):
-
Permit Validity (Max 5 Days) No weekend working around services: From
-
Until:
-
Safe System of Work Name and Number:
-
Task
Part 1
-
Location, Extent of Permit & Brief Description of Work
Part 2
-
Master Drawing : The following services have been identified in the master drawing
- Underground Electrical
- Gas
- Water
- Telecom
- Surface/Sewer
- Overhead Electrical
- Other (State)
Part 3 - Control Checks
-
Has the Red Hand Dig Permit been completed for the area of works concerned?
-
Details of Permit
-
Why (i.e. green field site no services shown on an information provided)
-
Is mechanical excavation required to step the sides to provide safe access and ground support for trial hole works?
-
Explain what has been done so far
-
Has the ground been marked to show the extent of the areas where mechanical excavation is not allowed? Example below
-
Provide photograph of the area
-
Have any new services been installed on the site?
-
Revert back to the Red Permit
-
Is there suitable fencing in place to secure the working area?
Site Manager / Supervisor & Responsible Person Acceptance
-
To be completed by Foreman/Supervisor to confirm that the aforementioned sketches and controls have been accepted:
-
Foreman / Supervisor
-
Foreman / Supervisor
Briefing by Responsible Person to Dig Team
-
To be signed by all personnel involved in undertaking the works to confirm understanding of:
1 Safe System of Work
2 The aforementioned sketch and controls.
3 Prohibition on the use of mechanical plant/equipment within 500mm of the located services -
NOTE: ALL UTILITIES MUST BE TREATED AS LIVE – IF YOU ENCOUNTER HARD SURFACES, SUCH AS CONCRETE, STOP WORK IMMEDIATELY AND SEEK FURTHER ADVICE FROM YOUR SUPERVISOR
-
Name of Employee
-
Name of Employee
-
Name of Employee
-
Name of Employee
-
Name of Employee
PERSONNEL CARRYING OUT THE WORK MUST INFORM THE SITE MANAGER / SUPERVISOR OF ANY ADDITIONAL FINDINGS OR VARIANCES
-
Additional findings - Not shown on, or variances relating to, the service(s) sketches:
CANCELLATION
-
The works have been completed/stopped and this permit is cancelled.
-
Site Manager/Supervisor