Title Page
-
Conducted on
-
Prepared by
-
Location
Pre Work Checks
-
This should be read in conjunction with this permit as the Asbestos Removal Control Plan (ARCP) provides all relevant regulation and legislative detail required for completing asbestos work.
-
Has a Asbestos Removal Control Plan (ARCP) been submitted, reviewed and accepted as complete and meeting regulations, the Approved Codes of Practice and the Universities requirements?
-
Is there an accompanying SSSP or Risk Assessment/s?
-
Has a WorkSafe notification been received and sighted?
-
Have you consulted the Site Asbestos Register for the work location?
Job Details
This Permit is only Valid when all sections are complete. If you are in doubt or don't understand, then please ask. Remember, all accidents are preventable and it is people who get hurt and suffer pain. Please use this permit in the spirit intended to protect yourself and others. Please ensure that you sign this permit to work. DO NOT PROCEED WITH YOUR WORK UNTIL YOUR PERMIT HAS BEEN AUTHORISED BY THE RELEVANT MEMBER OF STAFF.
-
Brief description of works being undertaken?
-
Any additional special tools or equipment to be used over the period of the work?
-
Has the work identified if it will be Asbestos Related Work or Asbestos Removal Work?
-
Is any other work currently being undertaken that may interact or affect this permit, such as Working at Height or Hot Works?
Asbestos Work Type, Hazards, Risks and Controls
All Work Type Requirements
-
Is the Asbestos Removal Control Plan (ARCP) onsite and known to workers?
-
Is the work being undertaken Class A related?
-
Is the work being undertaken Class B related?
-
Is air monitoring in place?
-
Do all licensed workers have their asbestos qualification cards on site?
-
-
Licensed Asbestos Removal - Licensed Work can only be undertaken by an approved WorkSafe Licensed Contractor. ******STOP WORK IF LICENSE IS NOT PRESENT ON SITE******
-
Does the work being conducted fall under 10 square metres?
-
Will an enclosure be used for this work and has this been smoke or pressure tested prior to work starting?
-
Are all workers onsite Asbestos Awareness Trained?
-
Do you have the equipment required in the Asbestos Essentials Method Statement? i.e. H Rated Vacuum Cleaner / Dust Extraction Equipment.
-
Do all workers have correct Personal Protective Equipment (PPE) as detailed in the Asbestos Removal Control Plan (ARCP) ?
-
Have all employees been trained in selection, fitting, decontamination and safe removal of Personal Protective Equipment (PPE)? <br> ** NB: If NO - Work is not Permitted as Mask will not provide protection **
-
Are all employees using Respiratory Protective Equipment (RPE) clean shaven?
-
Has a decontamination area been set up for workers and equipment?
-
Is a comprehensive asbestos waste process in place onsite and managed by a designated worker?
-
Is the Emergency Response Plan and Procedure known and displayed on site?
-
Unlicensed Asbestos Removal
-
Does the work being conducted fall under 10 square metres?
-
Are you Asbestos Awareness Trained?
-
Do you have the equipment required in the Asbestos Essentials Method Statement? i.e. H Rated Vacuum Cleaner / Dust Extraction Equipment.
-
Do all workers have correct Personal Protective Equipment (PPE) as detailed in the Asbestos Removal Control Plan (ARCP) ?
-
Have all employees been trained in selection, fitting, decontamination and safe removal of Personal Protective Equipment (PPE)? <br> ** NB: If NO - Work is not Permitted as Mask will not provide protection **
-
Are all employees using Respiratory Protective Equipment (RPE) clean shaven?
-
Is a comprehensive asbestos waste process in place onsite and managed by a designated worker?
-
Is the Emergency Response Plan and Procedure known and displayed on site?
Permit Approval
Contractor Section
-
Person in Charge of Works
-
Company
-
Signature
Permit Issuer
-
Name of Permit Issuer
-
Signature of Permit Issuer
Permit Period
-
Permit Issued on
-
Permit Expires on
Air Monitoring
-
Company Undertaking Air Clearance Test
-
Name of Person Undertaking Air Clearance Test
-
Air Clearance Result (WEL is 1 Asbestos Fibre /m3 Air)
-
Work Area is safe for persons to enter as Work Exposure Levels have not been exceeded?