Title Page
-
Sofia Offshore Wind Farm (SOWF)
-
Location
-
Conducted on
-
Prepared by
-
Contractor
CTV - Personnel Transfers
-
RAMS / Procedure in place for this activity?
-
Have the RAMS / procedure been communicated to those completing the transfers e.g. TBT including (but not limited to) PPE required, where to be positioned, method of communication. If possible please evidence TBT etc with picture.
-
Has the CTV Master / Crew provided instruction via a verbal brief, video or other means of instruction?
-
Were all personnel seated and wearing seatbelts during push on?
-
Observe putting on of PPE. Was this task safe? E.g. Are there any safety concerns e.g. limited space? Excessive vessel movement?
-
Are personnel wearing the suitable for the transfer? Is the PPE being worn correctly?
-
Are personnel carrying out "buddy checks" of one another's PPE and suitability to transfer?
-
Are CTV deck crew wearing suitable PPE for the transfer operations? Is the PPE being worn correctly?
-
Did deckhand check condition of transfer ladder and functionality of Self Retracting Line (SRL)?
-
Did personnel remain within the vessel accommodation block until signalled by vessel crew to enter the forward deck area?
-
Was deckhand attached to bow of vessel via safety line or similar during transfer operations?
-
Did deckhand give clear signal to transferee that it was OK to transfer when ready?
-
Was transfer and ascent / descent safe and controlled?
-
Did deckhand communicate clearly with transferee including countdown of ladder rungs "5,4,3,2,1?"?
-
Did all transferees move directly to an area of safety within the accommodation block of the vessel post transfer?