Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Flagged Items
-
Temporary loft light required?
-
Loft boarding required?
-
Loft access required?
Electrical requirements
-
Spare way for PV circuit?
-
Consumer unit visually compliant?
-
Import meter type
Resident Details
-
Resident name
-
Site address
-
Customer Energy Supplier
-
Telephone number
-
Email
-
Best days for installation
-
Any constraints?
Property Details
-
Property Type
- Detached
- Semi detached
- Maisonette
- Flat
- Bungalow
- Terraced
-
Construction type?
-
Age of dwelling
-
Listed/conservation area?
Structural
-
Roof type
-
Tile type
Roofing and Scaffold
-
Scaffolding located
-
Height of Eaves?
-
Access to rear?
-
Location of rear access
-
Length (along gutter) metres
-
Height (up roof slope) metres
-
Pitch degrees
-
Height of roof above eaves
-
Orientation from South
-
Roof Type
-
Size of Rafters
-
Number of Trussers/Rafters
-
Timber Condition
-
Felt condition
-
Loft condition
Electrical
-
Breaker Rating and Type
-
Location?
-
Distribution board update
-
Spare way for PV
-
Additional garage DB for PV
-
Earthing to Gas Meter
-
Gas meter location
-
Earthing to water main
-
Earthing type
-
Notes
Import Meter Type
-
Meter Type
-
Does the meter require changing?
-
Make and model of meter
-
Import meter location
-
Generation meter location (proposed)
Photovoltaic System Proposed
-
Inverter location
-
Can a 600x780 board fit on wall and through internal roof access
-
Cellular networks checked?
Photo Checklist
-
Property elevations, front door & scaffold access
-
Suitable Roof elevation close up including gutter
-
Proposed inverter location
-
Roof void including TV Ariel
-
Consumer unit and breakers
-
Water main bonding
-
Gas bonding
Shading
-
Has a survey been complete
SIGN OFF
-
Signature