Information
-
Audit Title
-
Client / Site
-
Location
-
Prepared by
-
Contact phone number
-
Conducted on
-
Other staff
-
Development Application Number
-
Complying Development Number
-
Construction Certificate Number
Inspection items
-
Pier holes are free of water
-
Notes
-
Pier holes are free of debris and excess spoil
-
Notes
-
Pier holes are down to appropriate depth or bearing pressure
-
Notes
-
Pier holes are on even bearing
-
Notes
-
Pier holes are at correct width
-
Notes
-
Pier holes are located as per engineers details
-
Notes
-
Reinforcing steel is as per engineers details
-
Notes
-
Reinforcing steel is appropriately tied with the required cover
-
Notes
-
Adequate piers have been bored
-
Notes
-
All piers are near vertical
-
Notes
-
Development as per the Development Consent
-
Noted unauthorised development
-
Site notes
-
Photograph
Required information
-
Required information to be submitted to Council
- Engineers certificate certifying the bearing pressure of the piers
- Concrete delivery receipt
Inspection result
-
Result of the inspection
- Satisfactory
- Satisfactory - minor works to be carried out
- Unsatisfactory - reinspection required after rectification works carried out
- Unsatisfactory - works not complete
- Stop all works - contact councils duty planner on 9735 1222, regarding unauthorised works
-
Should you have any enquiries regarding this inspection report please contact Auburn City Council on 9735 1222 or via email council@auburn.nsw.gov.au or in person at the customer service centre located at 1Susan Street, Auburn.