Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Date & Time:

  • Application No:

  • Address:
  • Lot No: DP No:

  • The work inspected:

  • NOT Satisfactory: Re-inspection required:

  • Council Officer:

  • "Yes" denotes compliance
    "No" denotes non-conformance
    "N/A" denotes not applicable

  • SITE CONTROLS - General

  • SC01 - Form 71 PCA appointment received

  • SC02 - PCA sign erected / Builders sign erected

  • SC03 - Damage to Council's asset(s)

  • SC04 - Water meter on site

  • SC05 - Toilet on site

  • SC06 - Sedimentation controls in place & appropriate

  • SC07 - Single site access managed

  • SITE CONTROLS - Earthworks

  • SC05 - Unprotected cut battered correctly (<2m H:L)

  • SC06 - Unprotected fill battered correctly (<2m H:L)

  • SC07 - Excavation >3m from neighbour's buildings

  • SC08 - Excavations DO NOT effect adjacent structures

  • SITE CONTROLS - Consent conditions & previous inspections

  • SC09 - DA conditions complied with

  • SC10 - Previous inspection instructions complied with

  • PIERS, FOOTING & SLABS - Area inspected.
    "F" denotes full inspection
    "P" denotes part inspection

  • PS01 - PIERS : Area inspected

  • PS02 - FOOTINGS : Area inspected

  • PS03 - SLABS : Area inspected

  • PS04 - Site installation as per design

  • PS05 -

  • PIERS, FOOTING & SLABS - Piers

  • PS06 - Piers correctly sited (boundaries & structures)

  • PS07 - Piers completed as per plan (MM area & depth)

  • PS08 - Piers cleaned out, compacted, no water

  • PS09 - Piers founded in natural ground level

  • PS10 - Steel / anchors installed as per plan

  • PS11 - Concrete grade as per plan

  • PS12

  • PIERS, FOOTING & SLABS - Footings

  • PS14 - Footings correctly sited (boundaries & structures)

  • PS15 - Footings completed as per plan (depth and width)

  • PS16 - Footings cleaned out, compacted, pipes protected, no water

  • PS17 - Steel installed as per plan

  • PS18 - Sufficient overlap on corner bars / transitions

  • PS19 - Starter bars placed as per plan

  • PS20 - Concrete coverage of steel as per plan

  • PS21 - Concrete grade as per plan

  • PS22 - Trimming bars okay

  • PS23 - Footing type as per plan

  • PS24

  • PIERS, FOOTING & SLABS - Slabs

  • PS25 - Slab/s correctly sited (boundaries & structures)

  • PS26 - Slab/s completed as per plan (dimensions)

  • PS27 - Slab area cleaned out, compacted, pipes protected, no water

  • PS28 - Membrane placed correctly, not damaged, taped overlapped

  • PS29 - Steel installed as per plan

  • PS30 - Bar chairs placed correctly

  • PS31 - Steel ties sufficient

  • PS32 - Sufficient overlap on corner bars / transitions

  • PS33 - Internal corner reinforcing placed (BCA 3.2, 5.3b)

  • PS34 - Starter bars placed as per plan

  • PS35 - Concrete coverage of steel as per plan (min)

  • PS36 - Concrete grade as per plan

  • PS37 - Termite protection as required

  • PS38 - Engineer's amended plan required prior to pour

  • PS39 - Amended engineer's plan required but okay to pour

  • P540 - Certificate required for:

  • Additional comments:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.