Title Page

  • Site Address

  • Conducted on

  • Inspected by:

Inspection during construction - Retaining Wall

  • Add image of site

  • With reference to structural plan number

Set-out

  • Distances from easements, Sydney water assets and Local Government Infrastructure confirmed?

Excavation of Retaining Wall Foundation

  • Dimensions of foundation with respect to height of retaining structure

  • Bearing surfaces of excavation

Compaction of Fill Material (if necessary)

  • Compaction Level/Density

Cut & Fill Batters

  • Location of Cut & Fill Batter

  • Construction and location of retaining walls (all retaining walls must be detailed before construction)

  • Provision of drainage for retaining walls

  • Falls to external finished areas i.e. away from habitable slab edges

Piers through fill

  • Location of piers through compacted fill

  • Depth and bedding of piers through compacted fill to natural ground or in accordance with approved design requirements

Reinforcement of Footing System

  • Type and placement of blockwork starter bars

  • Size and gauge of and spacing of reinforcing steel

  • Location and dimension of laps to reinforcement steel (refer typical detail sheet)

Other verbal advice provided to owner/contractor

  • undefined

Inspection result

  • Result of inspection

  • Should you have any questions regarding this inspection please contact Taylor Consulting on 02 9982 7092

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.