Inspection during construction - Retaining Wall
-
Add image of site
-
With reference to structural plan number
Set-out
-
Distances from easements, Sydney water assets and Local Government Infrastructure confirmed?
Excavation of Retaining Wall Foundation
-
Dimensions of foundation with respect to height of retaining structure
-
Bearing surfaces of excavation
Compaction of Fill Material (if necessary)
-
Compaction Level/Density
Cut & Fill Batters
-
Location of Cut & Fill Batter
-
Construction and location of retaining walls (all retaining walls must be detailed before construction)
-
Provision of drainage for retaining walls
-
Falls to external finished areas i.e. away from habitable slab edges
Piers through fill
-
Location of piers through compacted fill
-
Depth and bedding of piers through compacted fill to natural ground or in accordance with approved design requirements
Reinforcement of Footing System
-
Type and placement of blockwork starter bars
-
Size and gauge of and spacing of reinforcing steel
-
Location and dimension of laps to reinforcement steel (refer typical detail sheet)
Other verbal advice provided to owner/contractor
-
undefined
Inspection result
-
Result of inspection
- Satisfactory
- Satisfactory - minor works to be carried out
- Unsatisfactory - reinspection required after rectification works carried out
- Unsatisfactory - works not complete
- Stop all works - contact councils duty planner on 9735 1222, regarding unauthorised works
-
Should you have any questions regarding this inspection please contact Taylor Consulting on 02 9982 7092