Title Page

  • Site conducted

  • Project Number

  • Conducted on

  • Prepared by

  • Location
  • Field Number

  • Row Inspection Started

  • Row Inspection Finished

Piling Inspection

Piling Inspection

  • Pile height tolerance is within 25% of pile measurement above<br>ground as per Solarport manual - 125mm

  • Front and rear legs are correctly installed as per Solarport manual

  • Front and rear posts are not twisted more than the tolerances in Solarport manual

  • Pile verticality is within the tolerances stated in Solarport manual

  • Piles have been rammed using a string line to ensure line and level is correct

  • Pile spacing is as per Solarport manual

  • Any damaged pile heads have been repaired

  • All piles heads have had zinc paint applied.

  • All measurements have been checked and are as stated in Solarport manual.

  • PERFORMED BY:

  • DATE:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.