Pinch Drive/ Power Pack Pre-Start Checklist (Mines)<br>
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Pinch Drive/ Power Pack Pre-Start Checklist (Mines)<br>
-
01. What is the belt pull calculations
-
02. Check if the pinch drive used within the Working Load Limit (WLL)
-
03. Check condition of Lifting points.
-
04. Ensure belt pulling force do not exceed pinch drive capacity.
-
05. Check that direction of rotation of the Belt Puller is correct
-
06. Check for hydraulic leaks on the pump, motor, hoses, and tension chain cylinders.
-
07. Check all fitting match up with power pack. Check power supply cable and plug (if fitted) are suitable for use.
-
08. Check all the tie downs counter weights /Chain rating /bolting down arrangement met the pull calculation.
-
09. Ensure pulling plate is correct and within the Working Load Limit (WLL) of line pull.
-
10. Check for hydraulic oil level.
-
11. Ensure work area can accommodate the dimension of pinch drive / power pack.
-
12. Ensure work platform can accommodate the weight of pinch drive / Power pack
-
13. Check pinch drive for structural damage, cracked welds, bents, bolts & welds.
-
14. Check all the electrics are free from moisture and dirt.
-
15. Check guards for damage, loose bolts etc.
-
16. Check pinch drive pulley's for damage and sign of deformation of lagging
-
17. Check tie down chains & binders where applicable.
-
18. Check belt puller / Power pack isolation are operational <br>Electrical: key access switch on the control panel that isolates power from control lever to the input of the swash plate control. <br>Mechanical : Lockable isolation valves on the hydraulic oil delivery and return lines preventing flow to the main supply hoses.
-
19. Check setting pressure on the tension chain assembly.
-
20. Ensure that an appropriate form of communication protocol exists between the Belt Puller and other equipment used in the belt installation.
-
21. Check that power cable and oil lines are laid out such that they will not sustain damage or become a hazard
-
22. IRCP no. fitted for BHP asset.
-
40.0 Tested to 36 35.0 30.0 Max Rated Pull Force = 34 25.0 20.0 15.0 10.0 5.0 Tested to 200 0.0 0.0 50.0 100.0 150.0 200.0 250.0 Pressure (Bar) Is Belt puller & Pinch drive working load limit verification & test run satisfactory Signature of the and safe to use YES / NO person verified Note: Please discuss with the Supervisor/Workshop team for any unsatisfactory result for appropriate control.
-