Title Page
General Information
-
Project:
-
Contractor:
-
Conducted on:
-
Location:
-
Completed By:
-
Record Number:
Compliance Questions
1. Health and Safety
-
1.1: Is the work area safe and free from obstacles or trip hazards
-
1.2: Is the blast equipment, (hoses and compressor) free from damage and in good condition
-
1.3: Are all operators wearing the correct PPE for their task
2. Surface Preparation (before welding)
-
Record Pipe ID
-
2.1: Is the pipe end ready for blasting with the ovality and bevel completed
-
2.2: Is the abrasive the correct type (e.g., grit size, material) and stored properly on-site to prevent contamination or damage
-
Provide a photo of the product data label, including batch number
-
2.3: Are environmental conditions monitored and recorded before and during blasting
-
check and record the relative humidity and dew point in relation to the steel temperature
-
2.4: Is the steel surface cleaned and prepared to the specified cleanliness and profile, with the results recorded
-
SA 2½, 50-100 µm
-
2.5: Are salt contamination tests conducted and recorded after abrasive blasting, with chlorides levels below 20 mg/m²
-
Select the method
- Bresle Method: ISO 8502-6
- Conductometric Method: ISO 8502-9
-
2.6: Is the existing FBE coating edge feathered and a visual inspected performed to ensure no delamination
-
2.7: Is the pipe clean and free from abrasive materials or debris
-
2.8: Is the pipe cap fitted to protect the open end
3. Paint Application (Robot)
-
Record the Weld ID
-
3.1: Has the weld joint been released for coating, is the welding and NDT complete, and has the joint number been clearly documented for reporting
-
3.2: Have all functionality checks been completed before insertion into the pipe, camera, blaster, and vacuum working
-
3.3: Have environmental conditions (relative humidity, steel temperature, and dew point) been taken and recorded before starting the coating process
-
3.4: Has the uncoated cutback area been sweep blasted to the required cleanliness standard (Sa 2.5)
-
3.5: Has the existing FBE coating been feathered and given a profile to provide a key for the new coating
-
3.6: Is the weld area free from spatter, sharp edges, and excess root penetration?
-
3.7: Is the area to be coated free from dust particles and anomalies?
-
3.8: Has the daily paint mix and ratio check been completed, including the cup test, and results recorded both before and after application
-
3.9: Is the application free from repair and surface defects, such as sags, runs and pinholes
-
3.10: Have the correct Dry Film Thickness (DFT) measurements been achieved and recorded
-
DFT measured at 8 points around the joint
-
3.11: Is the coated area free from holidays, tested at the required voltage
-
Ensure the coating is free from holidays, verified by holiday detection at the correct voltage
-
3.12: If applicable, have any repairs been completed and inspected as per the procedure
-
Record the Weld ID
Feedback
-
Is there any way to improve our online form? Please enter the information below.