Title Page

  • Inspection carried out by:

  • Location:

  • Work/Job:

  • Select date

  • Section1. Site Acces Control.

  • 1.1 Have staff been signed in and received a safety brief?

  • Add media

  • 1.2 Is staff competency certification being checked? (Including contacting sentinel )

  • Add media

  • 1.4 have the limits of the Isolation / Possession been explained to you?

  • Add media

  • 1.5 Have site access and (if different ) plant access been identified?

  • Add media

  • 1.6 Has any environmental protection issues like: no shouting, no revving of engines, no slamming of doors been part of the brief?

  • Add media

  • 1.7 Have all the staff been made aware of the identity of the first aider?

  • Add media

  • Section 2. Site Manager (SM)

  • 2.1 Has a site manger (SM) been appointed to the site?

  • Add media

  • 2.2 Has the SM a copy of the work package plan document,

  • Add media

  • 2.3 Has the SM briefed the Task Safety briefing sheet(s) to each COSS ?

  • Add media

  • 2.4 Has each COSS signed the Task Safety brief?

  • Add media

  • Section 3 Engineering Supervisor (ES)

  • 3.1 Is the Engineering Superviser recognisable and wearing an armband?

  • Add media

  • 3.2 Has the ES a certificate RT3199; correctly filled out? (signed by COSS/PC)

  • Add media

  • 3.3 Does the ES have adequate communication with the PICOP/Control?

  • Add media

  • 3.4 Has the ES a copy of the work package plan document?

  • Add media

  • Section 4 Assistant site manager (ASM)

  • 4.1 Is there an Assistant site manager on site?

  • Add media

  • 4.2 Does the ASM understand his/her duties and is he/she carrying them out as to the site manager information card?

  • Add media

  • 4.3 Does the ASM hold a copy of the work package plan?

  • Add media

  • 4.4 Has each COSS signed the task safety brief?

  • Add media

  • 5 Controller of site safety (COSS)

  • 5.1 Are COSSs recognisable and wearing armbands?

  • Add media

  • 5.2 Does the COSS hold a certicate of competency?

  • Add media

  • 5.3 note the COSS name here:

  • 5.4 Has the COSS shown his Sentinal card to the gang members?

  • Add media

  • 5.5 Did the COSS check the sentinal cards of all gang members?

  • Add media

  • 5.6 Have site wardens/lookouts been clearly identified and introduced?

  • Add media

  • 5.7 Have actions in the event of an emergancy been explained?

  • Add media

  • 5.8 Is the COSS familiar with all the site hazards?

  • Add media

  • 5.9 Have access and egress routes been explained and adhered to?

  • Add media

  • 5.10 Has the direction of travel and speed of trains been explained?

  • Add media

  • 5.11 Have the limits of the worksite been explained and adhered to ?

  • Add media

  • 5.12 Has the position of safety been explained and shown?

  • Add media

  • 5.13 Has the method of warning been explained and tested?

  • Add media

  • 5.14 Have instructions been given on where and how to store , secure or remove materials?

  • Add media

  • 5.15 Has instruction been given in relation to third rail, overhead line hazards and controls to be applied?

  • Add media

  • 5.16 Has the position of safety for materials and equipment been explained?

  • Add media

  • 5.17 Have all staff on site received a task safety brief?

  • Add media

  • 5.18 Have all staff on site signed the task safety briefing sheet?

  • Add media

  • Section 6 lookouts and site wardens

  • 6.1 Do lookouts and site wardens have current certificates?

  • Add media

  • 6.2 Do lookouts and site wardens possess the current equipment , etc?

  • Add media

  • 6.3 Is lookout posted / Site warden in place?

  • Add media

  • 6.4 Have staff been briefed on method of warning and place of safety?

  • Add media

  • Section 7 Safety and welfare of persons on site.

  • 7.1 Is all personal protective equipment (PPE) being worn where appropriate?

  • Add media

  • 7.2 Is PPE in good condition?

  • Add media

  • 7.3 Is foul weather clothing clean and serviceable (including sub-contractors)?

  • Add media

  • 7.4 Is site lighting adequate including at the access point?

  • Add media

  • 7.5 Has the toilet block got hot and cold running water?

  • Add media

  • 7.6 Have messing facilities been provided and if so are they clean /in good order?

  • Add media

  • 7.7 Where site is more than 10 minutes from main toilet (at SAC) are addtional toilets near to site?

  • Add media

  • Section 8 Trains

  • 8.1 Have Eng trains been load examined and lables filled out by competent person?

  • Add media

  • 8.2 Are all ballast trains displaying lights at either end ( including those that have been split )?

  • Add media

  • 8.3 Are all trains being moved in accordance with the rule book?

  • Add media

  • 8.4 Are all trains identified by TOPS head code for the purpose of radio movements?

  • Add media

  • Section 9

  • 9.1 Are there sufficient First aid boxes on site?

  • Add media

  • 9.2 Are they easily accessable and complete?

  • Add media

  • Section 10

  • 10.1 Is small plant within date?

  • Add media

  • 10.2 Do operators hold valid and in date profiency certificates?

  • Add media

  • 10.3 Are operators wearing their plant specific ppe?

  • Add media

  • Section 11

  • 11.1 Is there a detailed crane controller plan for the road /railer crane?

  • Add media

  • 11.2 Are OTM and RRVs supervised by machine/ crane controllers?

  • Add media

  • 11.3 Is on/off tracking equipment availible and used. (i) At access/egess points? (ii) Between running lines?

  • Add media

  • 11.4 Have all machine operators performed their machine checks?

  • Add media

  • 11.5 Have all machine operators been briefed and signed the machine controller/crane controller brief?

  • Add media

  • Section 12

  • 12.1 Are fire precautions in place?

  • Add media

  • 12.2 Are road closure arrangements in place?

  • Add media

  • 12.3 Are materials, tools, equipment or plant away from areas of access/egress or running lines?

  • Add media

  • 12.4 Are there proper storage facilities availible for all equipment that is to be left on site after posessession?

  • Add media

  • Section 13

  • 13.1 Is waste being dealt with in an opppropriate manner? (Particular attention should be paid to welding materials)

  • Add media

  • 13.2 Is the noise level at a level to ensure it does not affect the safe system of work?

  • Add media

  • 13.3 Is dust kept low to ensure it does not affect the neighbouring property?

  • Add media

  • 13.4 Have welding implications been assessed i.e fire,damage and waste?

  • Add media

  • 13.5 Are exhaust emissions low so as they do not affect the surrounding area?

  • Add media

  • 13.6 Have spillages of oil, diesel or other contaminants been assessed?

  • Add media

  • 13.7 Are spill kits available on site?

  • Add media

  • 13.8 Are the on call emergancy spillage contractor contact details available?

  • Add media

  • 13.9 Are arragements adequate for parking road vehicles?

  • Add media

  • 13.10 Is site lighting placed so as not to affect neighbouring property?

  • Add media

  • General Comments:

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.