Information

  • 1343-CHK-0056

  • PLANT & LV SAFETY INSPECTION CHECKLIST

  • MC(APLNG)JV

  • Conducted on

  • Prepared by

  • Location
  • Personnel involved

Inspection Details

  • APLNG Upstream PH1 - Pipelines

  • Project No: 1343

  • PLANT & LV SAFETY INSPECTION CHECKLIST

  • 1343-CHK-0056

  • Inspected by Name:

  • Inspected by Company:

  • Inspected by Position:

  • Work Area:

  • LV / Plant Registration:

  • Photo of LV / Plant Registration:

  • LV / Plant ID:

  • Photo of LV/Plant ID:

  • Select date

  • Note 1 - In the event that noncompliance with a Golden Rule, HSE legislation or any other high risk is identified, the personnel conducting the inspection are to stop work immediately, discuss the issue with relevant workers and report the breach to the Project HSE Management Representative and Project Manager.

    Note 2 - Employee representatives and subcontractors are to be invited to attend Inspections for their relevant areas whenever practical and available. Names of personnel attending such inspections are to be a noted on inspection documents accordingly.

Inspection Checklist

LV

  • Driver Authorized

  • IVMS Installed:

  • Driver using personal IVMS Key:

  • Daily per-start checks completed:

  • Faults recorded:

  • No oil or fuel leaks:

  • Operators manual in LV/Plant:

  • Incoming plant inspection:

  • Weed and seed inspection certificate:

  • Registration current:

  • Seat belts installed/worn:

  • Bodywork clean and in good condition:

Mine Spec Equipment

  • Fire extinguisher fitted:

  • Fire extinguisher charged and in date:

  • First aid kit:

  • Snake bite kit:

  • Warning triangles:

  • ROPS:

  • Headlights 'always on' fitted:

  • UHF/VHF fitted and operational:

  • Wheel nut indicators installed:

  • Beacon and reversing alarm working:

  • All lights and indicators working:

  • Windscreen in good condition:

  • Tyres: Correct pressure and good condition:

  • Tyres: 2 spares:

  • Complying with No Smoking In Vehicle Policy:

  • Spill kit as required:

  • Cargo net and any load secured:

Plant

  • Operator authorized and VOC'd:

  • Plant ID:

  • Incoming plant inspection:

  • Daily pre-start checks completed:

  • Faults recorded:

  • No oil or fuel leaks:

  • Plant risk assessment available:

  • Operators manual:

  • First aid kit available:

  • UHF radio installed:

  • Weed and seed inspection certificate:

  • Bodywork clean and in good condition:

  • Fire extinguisher fitted:

  • Fire extinguisher charged and in date:

  • Seat belts installed/worn:

  • All lights and indicators working:

  • Complying with No Smoking In Vehicle Policy:

  • Spill kit as required:

  • Warning signs in place:

  • PPE worn for type of plant:

Cranage and Rigging

  • Operator, dogman, rigger, ticketed:

  • Log book/maintenance records:

  • Daily pre-start checks completed:

  • Load charts/certificates available:

  • All rigging gear tagged/colour:

  • Rigging gear/slings good condition:

  • Rigging gear/slings stored correctly:

  • Fire extinguisher fitted:

  • Fire extinguisher charged and in date:

  • 2 tag lines available:

  • Hooks, claps, shackles in good condition:

  • Outriggers used as necessary:

  • PPE available and worn:

Close out of Corrective Actions

Close out of corrective actions

  • Have all deficiencies identified and documented on the inspection checklist been rectified:

  • Inspected by signature:

  • Inspected with signature:

  • Inspected with signature:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.