Title Page
-
Project Name?
-
Type of Plant? (Telehandler/Crane/ Excavator etc.)
-
Make & Model (add photo of Plant)
-
Rego Number? (if registered)
-
Serial Number? (attach photo of compliance plate if possible)
-
Responsible Contractor?
-
Responsible Person and Contact Number?
-
Additional equipment
-
Date when next Maintenance Due
-
Conducted on
-
Prepared by
-
Location
-
Plant & Equipment Register No.
-
What is the next available Plant Number?
-
What is the next available Plant Number?
-
What is the next available Plant Number?
-
What is the next available Plant Number?
Compliance Statement
-
All items must be verified by the owner/ person responsible for the plant
-
Plant is installed/used in accordance with applicable Legislation, manufacturer’s requirements, and Australian Standards.
-
Plant is being maintained in accordance with the manufacturer’s requirements and the applicable Australian Standard.
-
Plant has had a Plant Risk Assessment performed, documented and risks are incorporated in the SWMS
-
What is the SWMS number?
-
Where is the SWMS for the Contractor, has operator signed it.
-
Obtain a signed copy before approving plant for use on Elevated Living Site.
-
Risks associated with operation of the Plant are included in SWMS?
-
Plant has been commissioned / set-up; and a plant-specific pre-start has been provided to EL before operation.
-
Plant has functional guarding, interlocking, and protective devices to protect operators / users. [Protective structures must have compliance plate]
-
Plant has appropriate movement warning system (visible and audible)
-
Manufacturers Operational Manual is available at the workplace/in the plant?
-
Ground conditions have been evaluated?
-
Overhead structures and objects have been identified?
-
Plant is the correct item for the works to be completed?
-
Sub Contractor signature
-
What is High Risk License number?
Plant Records (Records to be attached to Plant Permit)
-
Design Registration (e.g. Cranes >10T and Truck Concrete Pumps)
-
WorkSafe Registration (e.g. Cranes and Truck Concrete Pumps)
-
Plant Design Risk Assessment [evidence attached]?
-
Latest inspection and maintenance records:
-
What type of service was it?
-
When was the service completed?
-
Certifications for attachments or additional equipment e.g. lifting gear
Plant Operation Permit Authorisation
-
To be completed by Elevated Living Authoriser
-
Add signature
-
What is the EL Register number for this item of plant?
-
What is the next available line?
-
What is the next available line?
-
What is the next available line?
-
What is the next available line?