Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

PLASTER CHECKLIST

  • Confirm pre-line inspection is OK

  • Board is fixed clear of floor

  • Ceiling butt joins propped/blocked and wadded

  • Check ceiling battens

  • Ends of walls square

  • All cut outs, pipes, wires exposed / clear

  • All cove joints tidy/straight lines

  • All plaster correctly sanded

  • External corners sttraight and true

  • Checked with halogen light

  • Floors scraped clean

  • Chek orders/plans for non-standard items

  • Plaster recesses checked for square and tidy

  • GJ sign and danger sign up

  • Job left clean, rubbish in bin

  • Site left in safe manner

OTHER ITEMS

  • Document any other areas of concern using notes/photos as appropriate

COMPLETION SIGNATURE

  • Supervisor Signature

  • Date completed

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.