Sienna Homes
-
Site Location:
-
Date:
-
Inspection by:
Untitled Page
OHS&E
-
Has Weekly OHS&E Inspection been completed?
-
All tools and equipment tested and tagged?
-
Suitable fall protection in place?
-
Window/door openings have a safety rail installed on first floor? (at one metre)
-
Is the void protection in place?
Pre-start
-
-
Has the house and garage been swept out and cleaned by each trade prior to the delivery of plasterboard?
-
Is there sufficient access for the delivery of plasterboard?
-
Remove any temporary wall bracing at the time of the frame?
Insulation
-
All insulation to walls to be completed?
-
All ceiling insulation to be completed under metal deck roofs and/or skillion roofs?
-
All fire seal/party walls are to be installed to manufacturers requirements?
General
-
Has the meter box got a cavity flashing installed above?
-
Are all cavities free from mortar build up (bricklayers should have cleaned)?
-
Has all mortar been removed from the noggings and bottom plate (bricklayers should have cleaned)?