Fix, Pre-Paint & Waterproofing

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Untitled Page

Safety

  • Has weekly Safety Inspection been completed?

  • Has the house been swept out?

  • Has all rubbish been placed in the bin provided?

  • Are all tools tested and tagged?

  • Have all risks been assessed?

  • Are trades complying with their SWMS?

  • MSDS for waterproofing agent?

Plaster

  • All plaster offcuts have been put into the bin provided?

  • All external plaster corners are square and plumb?

  • All banding has been sanded smooth?

  • Wet area board has been installed to bathroom, ensuite and laundry?

  • Plaster ceiling to porches and Alfresco are 13mm Fyrecheck?

  • Check cornice to all rooms, including robes has been installed?

  • Pre-paint by plaster company has been completed after fix?

  • Check all cornice lines are straight and level?

Fix

  • All nails are punched?

  • Architrave mitres are sanded and flush?

  • Doorstops are nailed correctly - 1mm gap to latch side when shut and 3mm to hinge side?

  • All doors have a maximum 3mm gap to both sides and head with latch engaging correctly/

  • All doors must be packed on four places on both sides and installed plumb.

  • All windows are to operate freely and nailed home and punched?

  • All screws to hinges have been installed, and no hinges are damaged?

  • All latches line up with stricker plates and operate correctly?

  • Lift off hinges to wet areas have been installed correctly and the gap is adequate at the top?

  • All quirks around windows are consistent?

  • Manhole is installed as indicated on the plan (600x600)?

  • Joinery installed as per specifications and damage free?

  • Benchtop templates are on site?

  • Electrical/Heating cut outs have been done?

  • Place all left over fixing material in the garage.

  • Ensure the home is swept out and rubbish place in the bin provided?

Waterproofing

  • Are all works conducted in accordance with AS 3740:2021

  • Does waterproofing extend minimum of 150mm up the wall?

  • Are all pipes and drains penetrating the floor sealed?

  • All cracks are to be sealed prior to waterproofing?

  • Where floors meet walls, sealant or waterproof tape is to be installed?

  • Around all windows flexible sealant is to be installed between the window and wall membrane?

  • Shower screed is to be installed with a 1:80 fall and a minimum thickness of 10mm?

  • The shower outlet and spindles have been sealed?

  • The bath waterstop is in place?

  • Waterstop is installed to all door openings. Stud to stud?

  • Does the door waterstop finish half under the door?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.