Pre planner

  • Address: test

  • Date:

  • Pre-Planner Issue Date: yesterday

  • Inspection by: Ian

Pre Planner

  • Every question requires an answer and/or a photo.

Electrical items

  • Underground power pit available to property?

  • Any power lines in the street? nominate same side or opposite.

  • Are the power lines 4 metres from scaffold?

  • Are the power lines 3 metres from moving plant?

  • Is a permit to work inspection required (No Go Zone)?

  • Will we need to Install tiger tails?

  • Will a spotter be required?

Plumbing/Drainage

  • Water Tapping been installed?

  • Is the sewer riser avilable?

  • Is the stormwater riser available?

Permits

  • Do Sienna need to apply for a hoarding permit, to acquire use of a laneway, footpath or reserve?

Traffic Management

  • Will traffic control be required? Note: traffic management will be required if the property is located within 100 metres of Traffic lights/Hospital/Bus stop/School/ Blind spot or bend.

  • Is any delivery going to stop or interrupt traffic? (specify)

  • Is any delivery going to stop or interrupt pedestrian Traffic? (specify)

  • Is a traffic management plan required?

  • High traffic or prominent site, do we install a full banner sign?

  • Is adequate parking available for trades and material deliveries?

  • Any clearway/No stopping/ No parking signs that are near the site may need a permit through council?

Material Handling

  • Is there enough room on site for deliveries?

  • Any deliveries required to be delivered prior to construction?

  • Double handling required?

  • Rear brick delivery required?

  • Additional benching required for additional deliveries?

  • Are there any structures/ trees/ neighboring branches preventing safe deliveries?

  • Is additional weather material required to access or deliver material to site. (above standard order)?

Miscellaneous

  • Is existing fencing adequate and in good condition? if no please specify in following questions.

  • - Fencing condition left hand side?

  • - Fencing condition right hand side?-

  • - Fencing condition at the rear?

  • Will adjoining fencing need to be removed to construct on boundary? (Nominate location)

  • Do all boundary pegs exist? (If no nominate)

  • - Boundary pegs missing -

  • Is a re-establishment survey required?

  • Is there any rubbish/Debris/Asbestos/Chemicals on site needing removal?

  • Does grass need cutting prior to earth works?

  • Do any trees need to be removed?

  • Have any existing services been disconnected?

  • Is silt protection required?

  • Is there an adjoining garage built on the boundary? If yes provide height and length of the wall.

  • Is underpinning/undermining required

  • Any other hazards that may affect construction? ( i.e tranches, site slope etc please specify)

Adjoining Properties

  • Nominate adjoining properties:

  • - Left hand side - vacant, existing, under construction?

  • - Right hand side - vacant, existing, under construction?

  • - Rear - vacant, existing, under construction?

  • Fence condition, temporary or established

  • - Lefthand side

  • - Righthand side

  • - Rear

Asset protection

  • Footpaths - nominate any damage

  • Crossovers - nominate any damage

  • Kerb & channel - nominate any damage

  • Pit covers

Individual Lot photos

  • undefined

  • Lot #

  • Lot #

  • Lot #

  • Lot #

  • Lot #

  • Lot #

  • Lot #

  • Lot #

  • Lot #

  • Lot #

  • undefined

  • Lot #

  • Lot #

Items Requiring Action

  • undefined

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.