Title Page
-
Site conducted
-
Job Address:
-
Building Description:
-
Completed by:
-
Completed on:
1.0 Materials
-
1.1 - Are windows delivered
-
1.2 - Is front door delivered
-
1.3 - Is external door delivered
-
1.4 - Are cavity slider units delivered ( count up and measure check to make sure right ones have been delivered)
-
1.5 - Are garage jambs delivered
-
1.6 - Front door lock
-
1.7 - External door entrance set lock
-
1.8 - Is Tile under lay delivered
-
1.81 - Is Glue delivered
-
1.9 - Is bath delivered
-
1.91 - Is there enough timber onsite for building
-
1.92 - Are ply braces still onsite
-
1.93 - Is there insulation for double external ply braces ?
2.0 Trades
-
2.1 - Has electrician completed rough in
-
2.2 - Has plumber completed stacks
-
2.3 - Has plumber completed rough in
-
2.4 - Has Air conditioner installers finished
-
2.5 - Have sliding doors been wet sealed
-
2.6 - Have roofs been completed
3.0 Office
-
3.1 - Has frame inspection report been received
4.0 Defect Items:
-