Title Page

  • Site conducted

  • Job Address:

  • Building description:

  • Completed by:

  • Completed on:

1.0 Ground Floor Frame

  • 1.1 - Garage Jambs installed / plumb and parallel

  • 1.11 - Garage door nogs installed / minimum 105mm of timber beside opening

  • 1.12 - Is there enough room for garage door tracks

  • 1.2 - Front door installed

  • 1.21 - Front door qwerks are with in QBCC tolerances 9.0 window and doors Pg 38

  • 1.22 - Front door lock is installed as per QBCC tolerances 9.3 Door handles, locks and latches Pg 38

  • 1.23 - Front door lock works correctly has been checked with a construction key/ supervisor agrees

  • 1.3 - Check door openings are correct measurements / straight

  • 1.31 - Cavity slider units installed / Plumb and Pararell

  • 1.32 - Check robe openings are correct measurements / Straight

  • 1.4 - Studs have been marked on Floor

  • 1.5 - Windows / sliding doors have been installed as per Manufacturer specs / QBCC tolerances 9.7 Operation of windows and doors / 9.8 Bowed window heads, sills and jambs ref Pg. 39

  • 1.51 - sliding doors are set up flush with floor coverings/ cut down to suit floor coverings

  • 1.6 - Walls have been straightened as per QBCC tolerances 5.3 Straightness of timber frame surfaces ref Pg. 25

  • 1.61 - Bracing Walls have been packed with ply strips

  • 1.7 - Frames and posts are installed as per QBCC tolerances 5.2 Verticality or plumbness of timer frames and exposed posts ref Pg 25

  • 1.8 - Steel / stair void has been packed out with timber

  • 1.9 - Wet blocks have been installed

  • 1.91 - Ceiling lines have been checked for straight

  • 1.92 - Frames have been checked , studs work cladding

  • 1.93 - Roof / trusses have been framed out for cladding

  • 1.94 - All stacks have been built in

  • 1.95 - Check handrails for plumb and braced

2.0 1st Floor Frame

  • 2.1 - Check door openings are correct measurements / straight

  • 2.2 - Cavity slider units installed / Plumb and Pararell

  • 2.3 - Check robe openings are correct measurements / Straight

  • 2.4 - Studs have been marked on Floor

  • 2.5 - Windows / sliding doors have been installed as per Manufacturer specs / QBCC tolerances 9.7 Operation of windows and doors / 9.8 Bowed window heads, sills and jambs ref Pg. 39

  • 2.6 - sliding doors are set up flush with floor coverings/ cut down to suit floor coverings

  • 2.7 - Walls have been straightened as per QBCC tolerances 5.3 Straightness of timber frame surfaces ref Pg. 25

  • 2.8 - Bracing Walls have been packed with ply strips

  • 2.9 - Frames and posts are installed as per QBCC tolerances 5.2 Verticality or plumbness of timer frames and exposed posts ref Pg 25

  • 2.91 - Steel / stair void has been packed out with timber

  • 2.92 - Wet blocks have been installed

  • 2.93 - Ceiling lines have been checked for straight

  • 2.94 - Frames have been checked double studs cladding line up with lower / work cladding sheets

  • 2.95 - Roof/ Trusses have been framed out for cladding

  • 2.96 - All stacks have been built in

  • 2.97 - Check handrails for plumb and braced

  • 2.98 - Has tile underlay been installed ?

  • 2.99 - Has man hole been installed as per plans ?

3.0 2nd Floor Frame

  • 3.1 - Check door openings are correct measurements / straight

  • 3.2 - Cavity slider units installed / Plumb and Pararell

  • 3.3 - Check robe openings are correct measurements / Straight

  • 3.4 - Studs have been marked on Floor

  • 3.5 - Windows / sliding doors have been installed as per Manufacturer specs / QBCC tolerances 9.7 Operation of windows and doors / 9.8 Bowed window heads, sills and jambs ref Pg. 39

  • 3.6 - sliding doors are set up flush with floor coverings/ cut down to suit floor coverings

  • 3.7 - Walls have been straightened as per QBCC tolerances 5.3 Straightness of timber frame surfaces ref Pg. 25

  • 3.8 - Bracing Walls have been packed with ply strips

  • 3.9 - Frames and posts are installed as per QBCC tolerances 5.2 Verticality or plumbness of timer frames and exposed posts ref Pg 25

  • 3.91 - Steel / stair void has been packed out with timber

  • 3.92 - Wet blocks have been installed

  • 3.93 - Ceiling lines have been checked for straight

  • 3.94 - Frames have been checked double studs cladding line up with lower / work cladding sheets

  • 3.95 - Roof/ Trusses have been framed out for cladding

  • 3.96 - All stacks have been built in

  • 3.97 - Check handrails for plumb and braced

  • 3.98 - Has tile underlay been completed

  • 3.99 - Has man hole been installed as per plans

4.0 Office sign off

  • Supervisor Agrees all carpentry works have been completed to a Standard that complies with QBCC Tolerances / BCA 1684 Code / Each items above have been checked and are correct

  • Any works that could not be completed / or under supervisor written instruction due to site access issues / building issues will not commence until Purchase order has been issued

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.