Title Page
-
Site conducted
-
Job Address :
-
Building Description :
-
Completed By :
-
Completed On :
1.0 Materials
-
1.1 - All door locks onsite
-
1.2 - All towel rails onsite
-
1.3 - All Toilet roll holders onsite
-
1.4 All Towel rings onsite
-
1.5 - All Door stops onsite
-
1.6 - Is there a bin onsite
2.0 Trades
-
2.1 - Have painters re-installed doors
-
2.12 - Have painters installed 30mm 8G screws (doors re-hung properly)
-
2.2 - Are timber floors complete (so skirting can be completed)
-
2.3 - Has Supervisor marked out locations for fixings (with tape)
-
2.4 - Is the job clean
3.0 Office
-
3.1 - Has inspection been sent to supervisor
-
3.2 - Has supervisor walked around all accessories / checked delivery to make sure all items are onsite and all works can be completed.
4.0 Defect Items:
-