Title Page

  • Site conducted

  • Job Address:

  • Building Description:

  • Completed By :

  • Completed On :

1.0 Materials

  • 1.1 - Window flashings are onsite

  • 1.12 - Check bigger flashings required , garage, sliding doors etc

  • 1.2 - 40x40 Prime moulding windows

  • 1.3 - 31x11 Prime mouldings

  • 1.4 - 4.5mm PVC joint moulding

  • 1.5 - 42x11 Prime mouldings (cover strips)

  • 1.6 - Cladding order delivered

  • 1.7 - Check cladding specifications / all H flashings etc are onsite

  • 1.8 - Are there eaves with in 450mm of boundry ? fire rating

  • 1.9 - C/Class/ Timber delivery for framing soffits

  • 1.91 - Are the correct size sheets delivered to site (ref cladding mark up)

2.0 Trades

  • 2.1 - Sarking paper completed

  • 2.2 - All roofing completed / check flashings around job

  • 2.3 - Scaffolding has been organised

  • 2.4 - External wires, take photos of all wires fixed with nails only

3.0 office

  • 3.1 - Take photo of cladding orders / save to BT

  • 3.2 - Supervisor agrees that any services that are not fixed to a nail (set location ) we will not be responsible for pulling through services to save patching

  • 3.3 - Has supervisor signed off

  • 3.4 - Is there adequate room in bin for cladding waste

  • 3.5 - Has there been any changes to cladding plans

  • 3.6 - Cladding mark up received / saved to BT

  • 4.0 Defect Items:
The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.