Information
-
Audit Title / Site
-
Principal Contractor / Main Contractor
-
Client
-
Conducted on
-
Prepared by
-
Location
Documentation
-
All the documentation is in order?
Tap to enter information
-
-
Document and issue identified and action required
-
Close out date and signature
General Site
-
Are there any significant risks on site?
Tap to enter information
-
-
Type of issue identified and action required
-
Photo of issue identified
-
Close out date and signature
Work Equipment
-
Were any issues with plant or equipment identified?
Tap to enter information
-
-
Type of equipment and issue identified
-
Is the equipment safe too use?
Work at Height
-
Is all work at height well controlled
Tap to enter information
-
-
Work at height issue and corrective action
-
Image of issue
-
Can work continue safely
Fire an Emergency
-
Fire and emergency planning is suitable for the site?
Tap to enter information
-
Fire and emergency issue and corrective action
-
Image of issue