Information
-
Contractor on Site
-
Project Name and Code:
- A01 10ha Reclam
- A05 Quarry Haul rd
- B04B HV Electrical
- B04C Terminal Pavements
- C02B Pumphouse Waste Water
- C06 Oil Berth
- C08 Marina Development
- C09 Jetty 7
- C10 Jetty 2 Steelwork
- C11 Jetty 3 Breastwork
- C12 Jetty 4, 5 & 6 Demo
- C14B Operations Centre
- Other Project
- B06A Coal Compliance
- A08A Te Bay Geotechnical Investigations
- B20 Crane 5
- C15B Bridges
- C15C KiwiRail
- C18 Naval Point Haul Out
- P12 Tug
-
Project Current Phase:
-
Auditor Name
-
Date & Time
-
Description of Project Works
-
LPC - HSE01 - V1
Safety Observation
On-Site Health and Safety Observation:
-
Describe the appearance of the area you've observed: (housekeeping, debris, maintenance, congestion, etc)
-
Did you speak to any workers? if yes, what was the topic of conversation? (projects, tasks, safety requirements, concerns, etc)
-
What tasks did you observe? (lashing, loading, maintenance, etc)
-
Did you identify any new risks? Please explain: (interactions between machines, pedestrian areas, debris, storage, etc)
-
What safety controls did you observe? Explain how these were utilised? (toolbox meetings, PPE as per the LPC standards, spotter, STMS, etc)
-
Would you like to add photos?
-
Any further comments?
Environmental Observation
-
What work is currently happening on site?
-
What is your observation of what is happening on site and any other relevant information you think useful to note here.
Site Housekeeping
-
Does the site appear tidy and organised?
-
Take a photo of the construction area
-
Are there spills kits on site?
-
Have staff on site been through spill response training?
Construction Environmental Management Plan
-
Have all staff on site been briefed on the CEMP?
-
Have the relevant pre-construction briefings been completed?
-
Are all the required site inspections and routine checks being completed as detailed in the CEMP?
Dust
-
Are the dust control measures identified in the CEMP being implemented?
Contaminated Land
-
Has the contaminated land site briefing been completed?
-
Is the Contaminated Soil Management Plan implemented on site?
-
Are soil disposal logs recorded?
Archaeology
-
Has the Archaeologist site briefing been completed?
-
Are the archaeology control measures in the CEMP being implemented?
Erosion and Sediment Control
-
Are the erosion and sediment control measures identified in the CEMP implemented on site?
Noise
-
Are the noise measures in the CEMP implemented on site?
Hazardous Substances
-
Are there any hazardous substances stored on site?
-
If so, are they stored in accordance with procedures set out in the CEMP?
Other Environmental Effects and Issues, including any positive site observations
-
Please note down any other environmental management procedures implemented on site.
-
Take photos, if required
Signature:
-
Please sign here when you have finished the audit.