Document No.
-
Audit Title
-
Personnel
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Assessment Type
- Small Relocation Works (5-25m)
- Large Relocation Works (30-100m)
- Checkout Cash Tube Works
Site Induction
-
Site Induction Completed
-
RAMS Read and Signed
-
Permit To Works Completed
-
- Ladder Permit
- High Level Works Permit
-
Drug & Alcohol On Site Testing
-
- Pass
- Fail
-
Personnel Qualification Cards
-
UKATA
-
Ipaf
-
CSCS card
-
Personnel wearing current PPE and
-
Hard Hat
-
High Viz Vest
-
Safety Boots / Shoes
-
Safety Gloves
-
Safety Glasses
-
Ear Defenders / Plugs
-
Does engineer have basic tube installation tools
-
Tube Saw
-
Tube Deburrer
-
Tape Measure & Spirit Level
-
Stocko Crimping Pliers
-
Electronic Side Cutters
-
General Hand Tools
Pneumatic Tube System
-
System Type
- ATT - CT60
- ATT - CASHTRONIC
- HANTER - 01
- HANTER -02
- HANTER - MX
- HANTER - MVX
- HANTER - MVX (2 WAY)
- HORTIG - H36
- HORTIG - H38
- HORTIG - H51
- HORTIG - H61
-
Tube and Cable Installation<br>
-
Brackets installed and at correct distance apart 2.5m intervals
-
Tube installed straight and level
-
Tube sets correct
-
Cable installed and clipped to tube work every 1.5m
-
-
-
Remote Station Installation
-
Kiosk
-
Correct Station fitted and installed at correct height
-
Correct station brackets fitted and station secure
-
Valve and station card installed correctly
-
Valve cover fitted
-
Top Hat Fitted
-
Cabled install clipped and hidden behind tube
-
Cafe
-
Correct station fitted and installed at correct height
-
Correct station brackets fitted and station secure
-
Valve and station card installed correctly
-
Valve cover fitted
-
Top hat fitted
-
Cable install clipped and hidden behind tube
-
Pharmacy
-
Correct station fitted and installed at correct height
-
Correct station brackets fitted and station secure
-
Valve and station card installed correctly
-
Valve cover fitted
-
Top hat fitted
-
Cabled install clipped and hidden behind tube
-
Opticians
-
Correct station fitted and installed at correct height
-
Correct station brackets fitted and station secure
-
Valve installed correctly
-
Valve cover fitted
-
Top hat fitted
-
Cable install clipped and hidden behind tube
-
George Desk
-
Correct station fitted and installed at correct height
-
Correct station brackets fitted and station secure
-
Valve installed correctly
-
Valve cover fitted
-
Top hat fitted
-
Cable install clipped and hidden behind tube
-
Photo Shop
-
Correct station fitted and installed at correct height
-
Correct station brackets fitted and station secure
-
Valve and station card installed correctly
-
Valve cover fitted
-
Top hat fitted
-
Cable install clipped and hidden behind tube
-
MVG / Tech Desk
-
Correct station fitted and installed at correct height
-
Correct station brackets fitted and station secure
-
Valve and station card installed correctly
-
Valve cover fitted
-
Top hat fitted
-
Cable install clipped and hidden behind tube
-
Electrical Desk
-
Correct station fitted and installed at correct height
-
Correct station brackets fitted and station secure
-
Valve and station card installed correctly
-
Valve cover fitted
-
Top hat fitted
-
Cable install clipped at hidden behind tube
-
GM Desk
-
Correct station fitted and installed at correct height
-
Correct station brackets fitted and secure
-
Valve and station card installed correctly
-
Valve cover fitted
-
Top hat fitted
-
Cable install clipped and hidden behind tube
-
Main-bank Checkout Station Installation
-
Underfed Cash Tube
-
Trench tube work, merges installed correct
-
Overfed Cash Tube
-
Tube work, merges and bends installed correctly