Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Signed
COMPLETION CHECKS
-
Fire checks completed?
-
Site specific RAMS completed & Signed?
-
All waste responsibly cleared from site?
-
Property left in a safe & clean condition?
Operational Checks
-
System filled & pressure tested?
-
Tightness test completed?
-
Hot water delivery & temperature checks completed and confirmed correct as per MI's
-
Heating function test completed and all radiators tested for correct operation?
-
Heating & hot water controls tested for correct operation?
-
Programmer set to residents requirements?
Resident Handover Process
-
Have the boiler controls, functions & features been explained to the resident?
-
Have the boiler instructions & fault finding sheet been left with the resident?
-
Have the heating & hot water system controls been explained to the resident?
-
Have the programmer & thermostat instructions been left with the resident?
-
Has the resident satisfaction survey form been completed and signed by the occupants?
-
Has the Gas Safe Energy Saving Tips leaflet been left at the property?
Commissioning Documents
-
Has the Benchmark form been completed?
-
Image of Benchmark Form
-
Has an LGSR been completed?
-
Has the CO detector been checked for operation?
-
Co detector expiry date
-
Has the smoke detectors been checked for operation?
-
Smoke detector 1 expiry date
Installation images
-
Image of boiler
-
Image of flue terminal
-
Image of condense termination point
-
Image of thermostat and programmer
-
Image of hot water cylinder
-
Image of new radiators (CAPTURE IMAGES OF ALL RADIATORS IF NEW)
-
Image of flue route & brackets (ONLY IF NOT STANDARD HORIZONTAL FLUE)
-
Image of filter
-
Image of gas meter
Notable Damage
-
Have there been any damage caused to the property or residents belongings whilst completing the installation?
-
Has the office been informed?
-
Has the resident been informed?