Title Page

  • W/O #

  • W/R #

  • Date Completed

  • Inspector

  • Date Inspected

Post Job Audit Checklist

Inspection

  • Project Type

  • # of Point Sheets/Pole Locations

  • # of Equipment

  • # Standards to inspect

  • All points sheets were installed to AEP Standards (if no, list point sheet # and deficiencies below)

  • Equipment was tested or visually approved

  • All red lines were noted on the job sketch

  • All material/trash was removed from jobsite

  • Job site was free of hazards

  • Notes: (List any deficiencies found)

  • Inspected and meets AEP standards

  • Note: Inspection must be recorded in DWMS

Rework Inspection

  • Rework Inspection Date

  • Rework Completed On

  • Inspected and meets AEP standardsÅ‚

Management Review

  • Signature:

  • Completed Date:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.