Title Page
-
W/O #
-
W/R #
-
Date Completed
-
Inspector
-
Date Inspected
Post Job Audit Checklist
Inspection
-
Project Type
- Circuit Inspection
- Failed Equip No Outage
- New Customers
- Pole Replacement
- Recloser Replacement
- Relocation
- Sectionalizing
- Small Wire Repl Ovhd
- Upgrades
- Other (Explain in notes)
-
# of Point Sheets/Pole Locations
-
# of Equipment
-
# Standards to inspect
-
All points sheets were installed to AEP Standards (if no, list point sheet # and deficiencies below)
-
Equipment was tested or visually approved
-
All red lines were noted on the job sketch
-
All material/trash was removed from jobsite
-
Job site was free of hazards
-
Notes: (List any deficiencies found)
-
Inspected and meets AEP standards
-
Note: Inspection must be recorded in DWMS
Rework Inspection
-
Rework Inspection Date
-
Rework Completed On
-
Inspected and meets AEP standardsł
Management Review
-
Signature:
-
Completed Date: