POST SITE INSPECTION

POST SITE INSPECTION

Has an inspection be completed?

What time will the inspection be done?

And by who?

Inspected by:

Time of inspection
ROAD

Is the Kerb and Gutter/open drains in good condition?

Is the road in good condition?

Road construction type

ACCESS AND DRIVEWAY

How many accesses?

ACCESS 1
Location of access

Is it a single access or double width access

Is the development able to achieve sight distance

Does the access comply with Council's required gradients

Type of access

Does the access comply with KSD 1-07

Is the access concrete

Does the access need comply with KSD 2-02a

Are head walls required?

Is a culvert required?

Is it seal to the lot proper?

ACCESS 1
Location of access

Is it a single access or double width access

Is the development able to achieve sight distance

Does the access comply with Council's required gradients

Type of access

Does the access comply with KSD 1-07

Is the access concrete

Does the access need comply with KSD 2-02a

Are head walls required?

Is a culvert required?

Is it seal to the lot proper?

ACCESS 2
Location of access

Is it a single access or double width access

Is the development able to achieve sight distance

Does the access comply with Council's required gradients

Type of access

Does the access comply with KSD 1-07

Is the access concrete

Does the access need comply with KSD 2-02a

Is a culvert required?

Are head walls required?

Is it seal to the lot proper?

ACCESS 1
Location of access

Is it a single access or double width access

Is the development able to achieve sight distance

Does the access comply with Council's required gradients

Type of access

Does the access comply with KSD 1-07

Is the access concrete

Does the access need comply with KSD 2-02a

Is a culvert required?

Are head walls required?

Is it seal to the lot proper?

ACCESS 2
Location of access

Is it a single access or double width access

Is the development able to achieve sight distance

Does the access comply with Council's required gradients

Type of access

Does the access comply with KSD 1-07

Is the access concrete

Does the access need comply with KSD 2-02a

Is a culvert required?

Are head walls required?

Is it seal to the lot proper?

ACCESS 3
Location of access

Is it a single access or double width access

Is the development able to achieve sight distance

Does the access comply with Council's required gradients

Type of access

Does the access comply with KSD 1-07

Is the access concrete

Does the access need comply with KSD 2-02a

Is a culvert required?

Are head walls required?

Is it seal to the lot proper?

ACCESS 1
Location of access

Is it a single access or double width access

Is the development able to achieve sight distance

Does the access comply with Council's required gradients

Type of access

Does the access comply with KSD 1-07

Is the access concrete

Does the access need comply with KSD 2-02a

Is a culvert required?

Are head walls required?

Is it seal to the lot proper?

ACCESS 2
Location of access

Is it a single access or double width access

Is the development able to achieve sight distance

Does the access comply with Council's required gradients

Type of access

Does the access comply with KSD 1-07

Is the access concrete

Does the access need comply with KSD 2-02a

Is a culvert required?

Are head walls required?

Is it seal to the lot proper?

ACCESS 3
Location of access

Is it a single access or double width access

Is the development able to achieve sight distance

Does the access comply with Council's required gradients

Type of access

Does the access comply with KSD 1-07

Is the access concrete

Does the access need comply with KSD 2-02a

Is a culvert required?

Are head walls required?

Is it seal to the lot proper?

ACCESS 4
Location of access

Is it a single access or double width access

Is the development able to achieve sight distance

Does the access comply with Council's required gradients

Type of access

Does the access comply with KSD 1-07

Is the access concrete

Does the access need comply with KSD 2-02a

Is a culvert required?

Are head walls required?

Is it seal to the lot proper?

ACCESS 1
Location of access

Is it a single access or double width access

Is the development able to achieve sight distance

Does the access comply with Council's required gradients

Type of access

Does the access comply with KSD 1-07

Is the access concrete

Does the access need comply with KSD 2-02a

Is a culvert required?

Are head walls required?

Is it seal to the lot proper?

ACCESS 2
Location of access

Is it a single access or double width access

Is the development able to achieve sight distance

Does the access comply with Council's required gradients

Type of access

Does the access comply with KSD 1-07

Is the access concrete

Does the access need comply with KSD 2-02a

Is a culvert required?

Are head walls required?

Is it seal to the lot proper?

ACCESS 3
Location of access

Is it a single access or double width access

Is the development able to achieve sight distance

Does the access comply with Council's required gradients

Type of access

Does the access comply with KSD 1-07

Is the access concrete

Does the access need comply with KSD 2-02a

Is a culvert required?

Are head walls required?

Is it seal to the lot proper?

ACCESS 4
Location of access

Is it a single access or double width access

Is the development able to achieve sight distance

Does the access comply with Council's required gradients

Type of access

Does the access comply with KSD 1-07

Is the access concrete

Does the access need comply with KSD 2-02a

Is a culvert required?

Are head walls required?

Is it seal to the lot proper?

ACCESS 5
Location of access

Is it a single access or double width access

Is the development able to achieve sight distance

Does the access comply with Council's required gradients

Type of access

Does the access comply with KSD 1-07

Is the access concrete

Does the access need comply with KSD 2-02a

Is a culvert required?

Are head walls required?

Is it seal to the lot proper?

FOOTPATH

Is there a footpath?

Footpath construction type

Is there footpaths and do they comply with KSD's?

Photos

DEPOSIT REFUND AUTHORITY FOR KERB & GUTTER BOND

DEPOSIT REFUND AUTHORITY FOR KERB & GUTTER BOND

Are works been completed and meet the requirements for the refund of the Kerb & Gutter Bond?

Refund to:

Address:

Detail:

Application:

Deposit number:

Deposit date:

Account:

AUTHORISED FOR REFUND
Final Kerb & Gutter inspection was completed by
Authorised for a refund:
FINANCE OFFICER
Payment details checked by:

G/L Account Number 1.02.000.2068.00000

Please note that this checklist is a hypothetical example and provides basic information only. It is not intended to take the place of, among other things, workplace, health and safety advice; medical advice, diagnosis, or treatment; or other applicable laws. You should also seek your own professional advice to determine if the use of such checklist is permissible in your workplace or jurisdiction.