Information

  • Document No.

  • PID

  • Location
  • Conducted on

  • The application was lodged by

  • Council's planning officer

  • Council's plumbing officer

  • Council's health officer

  • Council's building officer

  • Council's engineering officer

TYPE OF DEVELOPMENT

  • TICK THE TYPE OF DEVELOPMENT.

  • New dwelling

  • New ancillary dwelling

  • Rebuild of dwelling

  • Demolition dwelling

  • Extension to dwelling

  • Shed or outbuilding

  • Deck, patio or veranda

  • Other

  • Describe type of development.

SERVICES

  • Is there stormwater, water or sewer infrastructure to service the development or close to the property?

  • Is there a stormwater connection?

  • Is the development clear of all stormwater pipes?

  • Is the development clear of all stormwater manholes?

  • Is there a sewer connection?

  • Is the development clear of all sewer pipes?

  • Is the development clear of all sewer manholes?

  • Is there a water connection?

  • Is the development clear of all water pipes?

  • Is the development clear of all easements?

STORMWATER AND DRAINAGE

  • Does the development have the ability to discharge Stormwater into Council's stormwater system, a watercourse or an open drain?

  • What is the type of stormwater system can the development use?

  • What is the size stormwater system can the development use?

  • Is the stormwater connection to the main pipe adequately sized?

  • Is the existing Stormwater system able to cope with Stormwater for the development?

  • What is the size stormwater system can the development use?

  • Is the stormwater connection to the main pipe adequately sized?

  • Is the existing Stormwater system able to cope with Stormwater for the development?

  • What type of pipe is it?

  • What is the size stormwater system can the development use?

  • Is the stormwater connection to the main pipe adequately sized?

  • Is the existing Stormwater system able to cope with Stormwater for the development?

  • Where is the open drain located?

  • Is the existing Stormwater system able to cope with Stormwater for the development?

  • Why?

ROAD

  • Is the road network able to cope with the extra traffic caused by the development?

  • What is the type of road construction that the development will connect to?

  • Is the a traffic risk or is a traffic impact assessment (TIA) requiered?

  • Has a TIA been supplied?

ACCESS AND DRIVEWAY

  • Does the development comply with the required distance between access and road junctions?

  • Does the development have direct access to the road network?

  • The development does not need a "Right of Way" easement to access the road network?

  • Is it a urban access?

  • Is there only one access to the development?

  • Does the access and driveway comply with Council's required gradients?

  • Is the existing or proposed access constructed in a standard grey concrete with a not slip finish?

  • Is the driveway sealed to the lot proper?

  • Is it a single or double width access?

  • Does the access comply with KSD 1-07?

  • Is there only one access to the development?

  • Does the access comply and driveway with Council's required gradients?

  • Is the connecting road of a sealed construction?

  • Is a culvert required?

  • Are head walls required?

  • Doers the access need to be of a sealed to match the existing road?

  • Is it a single or double width access?

  • Does the access comply with KSD 2-02a?

FOOTPATHS

  • Is there council footpath provided?

  • What type of footpath has been constructed?

  • Does the footpath comply with relevant KSD?

SOIL AND WATER MANAGEMENT

  • Is only minor earth works are being done?

  • The development dose not need any retaining walls?

  • Is the retaining wall greater than 1m in height?

  • Has the retaining wall been certified by an professional engineer?

  • Do the plans show sub-soil drainage?

  • Has a soil and water plan been supplied?

  • The submitted plan does comply?

  • Are cut and fill zone been shown on plan?

  • The development will not be affected by possible flooding based on its topography?

REFERRALS

  • Does it require to be referred to Southern Water?

  • Has it been referred to southern water?

  • By who?

  • Does it require to be referred to DIER?

  • Has it been referred to DIER?

  • By who?

PERMITS

  • Does the development require a Council's road works permit?

  • Does the development require a D.I.E.R. permit?

FURTHER INFORMATION

  • Further information to assess this development application?

  • What are the issues?

  • What are the issues

SITE INSPECTION

  • Is a site inspection require to assess this application?

  • Has a inspection be completed?

  • What time will the inspection be done?

  • And by who?

  • Inspected by:

  • Add location
  • Time of inspection

SERVICE CONNECTIONS

  • Stormwater

  • Add media

  • Sewer

  • Add media

  • Water

  • Add media

  • Power

  • Add media

ACCESS AND DRIVEWAY

  • Type of access

  • Is the development able to achieve sight distance

  • Add media

  • Add media

  • Is there on one access per lot

  • Does the access comply with KSD 1-07

  • Add media

  • Is the access concrete

  • Is it a single access or double width access

  • Is it seal to the lot proper?

  • Is the development able to achieve sight distance

  • Add media

  • Add media

  • Is there on one access per lot

  • Does the access need comply with KSD 2-02a

  • Add media

  • Does the access comply with Council's required gradients

  • Is a culvert required?

  • Are head walls required?

  • Is the road of a sealed construction

  • Doers the access need to be of a sealed to match the existing road?

  • Is it a single access or double width access

ROAD

  • Kerb and Gutter/open drains in good condition?

  • Is the road a standard with and does it comply with KSD's?

  • Road construction type

  • Add media

FOOTPATH

  • Footpath construction type

  • Is there footpaths and do they comply with KSD's?

  • Add media

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.