Information
-
Document No.
-
PID
-
Location
-
Conducted on
-
The application was lodged by
- Planning Counter
- Carol Morgarn
- Chelsea Woolnough
- Mary Armstrong
- Monique Griggs
- Sara Piper
- Trish Stolorz
-
Council's planning officer
- 8249 Dianne Cowen
- 8126 Melissa Stevenston
- 8104 Adam Smee
- 8242 Trent Henderson
- 8150 Danielle Gray
- 8129 Mary Gibbs
-
Council's plumbing officer
- 8107 Antony Woolley
- 8233 Rod Browne
- 8152 Dallas Hayers
-
Council's health officer
- 8297 Jon Doole
- 8173 Sara Gillie
- 8173 Fiona Harriss
- 8240 Aby McGuire
- 8171 John DeVries
-
Council's building officer
- 8247 Greg Wilson
- 8219 Jessica Critchley
-
Council's engineering officer
- 8280 Paul Verné
- 8251 Brendon Moore
- 8131 Peter Williams
TYPE OF DEVELOPMENT
-
TICK THE TYPE OF DEVELOPMENT.
-
New dwelling
-
New ancillary dwelling
-
Rebuild of dwelling
-
Demolition dwelling
-
Extension to dwelling
-
Shed or outbuilding
-
Deck, patio or veranda
-
Other
-
Describe type of development.
SERVICES
-
Is there stormwater, water or sewer infrastructure to service the development or close to the property?
-
Is there a stormwater connection?
-
Is the development clear of all stormwater pipes?
-
Is the development clear of all stormwater manholes?
-
Is there a sewer connection?
-
Is the development clear of all sewer pipes?
-
Is the development clear of all sewer manholes?
-
Is there a water connection?
-
Is the development clear of all water pipes?
-
Is the development clear of all easements?
STORMWATER AND DRAINAGE
-
Does the development have the ability to discharge Stormwater into Council's stormwater system, a watercourse or an open drain?
-
What is the type of stormwater system can the development use?
- Open drain
- Concrete pipe
- PVC pipe
- other type of pipe
- not sure
- N/A
-
What is the size stormwater system can the development use?
- 100mm
- 150mm
- 225mm
- 300mm
- 375mm
- 450mm
- 525mm
- 650mm
- 750mm
- 1000mm
- 1200mm
- 1500mm
- 1800mm
- 2000mm
-
Is the stormwater connection to the main pipe adequately sized?
-
Is the existing Stormwater system able to cope with Stormwater for the development?
-
What is the size stormwater system can the development use?
- 100mm
- 150mm
- 225mm
- 300mm
- 375mm
- 450mm
- 525mm
- 650mm
- 750mm
- 1000mm
- 1200mm
- 1500mm
- 1800mm
- 2000mm
-
Is the stormwater connection to the main pipe adequately sized?
-
Is the existing Stormwater system able to cope with Stormwater for the development?
-
What type of pipe is it?
-
What is the size stormwater system can the development use?
- 100mm
- 150mm
- 225mm
- 300mm
- 375mm
- 450mm
- 525mm
- 650mm
- 750mm
- 1000mm
- 1200mm
- 1500mm
- 1800mm
- 2000mm
-
Is the stormwater connection to the main pipe adequately sized?
-
Is the existing Stormwater system able to cope with Stormwater for the development?
-
Where is the open drain located?
- Road reservation
- Within the property
- Within next doors property
- Within a reserve
-
Is the existing Stormwater system able to cope with Stormwater for the development?
-
Why?
ROAD
-
Is the road network able to cope with the extra traffic caused by the development?
-
What is the type of road construction that the development will connect to?
-
Is the a traffic risk or is a traffic impact assessment (TIA) requiered?
-
Has a TIA been supplied?
ACCESS AND DRIVEWAY
-
Does the development comply with the required distance between access and road junctions?
-
Does the development have direct access to the road network?
-
The development does not need a "Right of Way" easement to access the road network?
-
Is it a urban access?
-
Is there only one access to the development?
-
Does the access and driveway comply with Council's required gradients?
-
Is the existing or proposed access constructed in a standard grey concrete with a not slip finish?
-
Is the driveway sealed to the lot proper?
-
Is it a single or double width access?
-
Does the access comply with KSD 1-07?
-
Is there only one access to the development?
-
Does the access comply and driveway with Council's required gradients?
-
Is the connecting road of a sealed construction?
-
Is a culvert required?
-
Are head walls required?
-
Doers the access need to be of a sealed to match the existing road?
-
Is it a single or double width access?
-
Does the access comply with KSD 2-02a?
FOOTPATHS
-
Is there council footpath provided?
-
What type of footpath has been constructed?
-
Does the footpath comply with relevant KSD?
SOIL AND WATER MANAGEMENT
-
Is only minor earth works are being done?
-
The development dose not need any retaining walls?
-
Is the retaining wall greater than 1m in height?
-
Has the retaining wall been certified by an professional engineer?
-
Do the plans show sub-soil drainage?
-
Has a soil and water plan been supplied?
-
The submitted plan does comply?
-
Are cut and fill zone been shown on plan?
-
The development will not be affected by possible flooding based on its topography?
REFERRALS
-
Does it require to be referred to Southern Water?
-
Has it been referred to southern water?
-
By who?
- 8280 Paul Verné
- 8251 Brendon Moore
- 8131 Peter Williams
-
Does it require to be referred to DIER?
-
Has it been referred to DIER?
-
By who?
- 8280 Paul Verné
- 8251 Brendon Moore
- 8131 Peter Williams
PERMITS
-
Does the development require a Council's road works permit?
-
Does the development require a D.I.E.R. permit?
FURTHER INFORMATION
-
Further information to assess this development application?
-
What are the issues?
- Stormwater discharge
- Stormwater connections locations
- Stormwater upgrades
- Drainage issues
- Driveway drainage
- Driveway construction
- Driveway gradients
- Access location
- Access upgrade
- Sight distance
- Number of accesses
- Access issues
- 'Right Of Way' access
- Crown land access
- Retaining walls
- Sub-soil drainage
- Needs a TIA
- Floor levels
- Flooding
- Footing are to close to services.
- Needs DIER consent/permit
- Other issues
-
What are the issues
SITE INSPECTION
-
Is a site inspection require to assess this application?
-
Has a inspection be completed?
-
What time will the inspection be done?
-
And by who?
-
Inspected by:
-
Add location
-
Time of inspection
SERVICE CONNECTIONS
-
Stormwater
-
Add media
-
Sewer
-
Add media
-
Water
-
Add media
-
Power
-
Add media
ACCESS AND DRIVEWAY
-
Type of access
-
Is the development able to achieve sight distance
-
Add media
-
Add media
-
Is there on one access per lot
-
Does the access comply with KSD 1-07
-
Add media
-
Is the access concrete
-
Is it a single access or double width access
-
Is it seal to the lot proper?
-
Is the development able to achieve sight distance
-
Add media
-
Add media
-
Is there on one access per lot
-
Does the access need comply with KSD 2-02a
-
Add media
-
Does the access comply with Council's required gradients
-
Is a culvert required?
-
Are head walls required?
-
Is the road of a sealed construction
-
Doers the access need to be of a sealed to match the existing road?
-
Is it a single access or double width access
ROAD
-
Kerb and Gutter/open drains in good condition?
-
Is the road a standard with and does it comply with KSD's?
-
Road construction type
-
Add media
FOOTPATH
-
Footpath construction type
-
Is there footpaths and do they comply with KSD's?
-
Add media