Information
-
Application:
-
Council's engineering officer
- 8280 Paul Verné
- 8251 Brendon Moore
- 8131 Peter Williams
PRE SITE INSPECTION
PRE SITE INSPECTION
-
Has a inspection be completed?
-
What time will the inspection be done?
-
And by who?
-
Inspected by:
-
Time of inspection
ROAD
-
Is the Kerb and Gutter/open drains in good condition?
-
Is the road in good condition?
-
Road construction type
ACCESS AND DRIVEWAY
-
How many accesses?
ACCESS 1
-
Location of access
-
Is it a single access or double width access
-
Is the development able to achieve sight distance
-
Does the access comply with Council's required gradients
-
Type of access
-
Does the access comply with KSD 1-07
-
Is the access concrete
-
Does the access need comply with KSD 2-02a
-
Is a culvert required?
-
Are head walls required?
-
Is it seal to the lot proper?
ACCESS 1
-
Location of access
-
Is it a single access or double width access
-
Is the development able to achieve sight distance
-
Does the access comply with Council's required gradients
-
Type of access
-
Does the access comply with KSD 1-07
-
Is the access concrete
-
Does the access need comply with KSD 2-02a
-
Is a culvert required?
-
Is a culvert required?
-
Is it seal to the lot proper?
ACCESS 2
-
Location of access
-
Is it a single access or double width access
-
Is the development able to achieve sight distance
-
Does the access comply with Council's required gradients
-
Type of access
-
Does the access comply with KSD 1-07
-
Is the access concrete
-
Does the access need comply with KSD 2-02a
-
Is a culvert required?
-
Are head walls required?
-
Is it seal to the lot proper?
ACCESS 1
-
Location of access
-
Is it a single access or double width access
-
Is the development able to achieve sight distance
-
Does the access comply with Council's required gradients
-
Type of access
-
Does the access comply with KSD 1-07
-
Is the access concrete
-
Does the access need comply with KSD 2-02a
-
Is a culvert required?
-
Are head walls required?
-
Is it seal to the lot proper?
ACCESS 2
-
Location of access
-
Is it a single access or double width access
-
Is the development able to achieve sight distance
-
Does the access comply with Council's required gradients
-
Type of access
-
Does the access comply with KSD 1-07
-
Is the access concrete
-
Does the access need comply with KSD 2-02a
-
Is a culvert required?
-
Are head walls required?
-
Is it seal to the lot proper?
ACCESS 3
-
Location of access
-
Is it a single access or double width access
-
Is the development able to achieve sight distance
-
Does the access comply with Council's required gradients
-
Type of access
-
Does the access comply with KSD 1-07
-
Is the access concrete
-
Does the access need comply with KSD 2-02a
-
Is a culvert required?
-
Are head walls required?
-
Is it seal to the lot proper?
ACCESS 1
-
Location of access
-
Is it a single access or double width access
-
Is the development able to achieve sight distance
-
Does the access comply with Council's required gradients
-
Type of access
-
Does the access comply with KSD 1-07
-
Is the access concrete
-
Does the access need comply with KSD 2-02a
-
Is a culvert required?
-
Are head walls required?
-
Is it seal to the lot proper?
ACCESS 2
-
Location of access
-
Is it a single access or double width access
-
Is the development able to achieve sight distance
-
Does the access comply with Council's required gradients
-
Type of access
-
Does the access comply with KSD 1-07
-
Is the access concrete
-
Does the access need comply with KSD 2-02a
-
Is a culvert required?
-
Are head walls required?
-
Is it seal to the lot proper?
ACCESS 3
-
Location of access
-
Is it a single access or double width access
-
Is the development able to achieve sight distance
-
Does the access comply with Council's required gradients
-
Type of access
-
Does the access comply with KSD 1-07
-
Is the access concrete
-
Does the access need comply with KSD 2-02a
-
Is a culvert required?
-
Are head walls required?
-
Is it seal to the lot proper?
ACCESS 4
-
Location of access
-
Is it a single access or double width access
-
Is the development able to achieve sight distance
-
Does the access comply with Council's required gradients
-
Type of access
-
Does the access comply with KSD 1-07
-
Is the access concrete
-
Does the access need comply with KSD 2-02a
-
Is a culvert required?
-
Are head walls required?
-
Is it seal to the lot proper?
ACCESS 1
-
Location of access
-
Is it a single access or double width access
-
Is the development able to achieve sight distance
-
Does the access comply with Council's required gradients
-
Type of access
-
Does the access comply with KSD 1-07
-
Is the access concrete
-
Does the access need comply with KSD 2-02a
-
Is a culvert required?
-
Are head walls required?
-
Is it seal to the lot proper?
ACCESS 2
-
Location of access
-
Is it a single access or double width access
-
Is the development able to achieve sight distance
-
Does the access comply with Council's required gradients
-
Type of access
-
Does the access comply with KSD 1-07
-
Is the access concrete
-
Does the access need comply with KSD 2-02a
-
Is a culvert required?
-
Are head walls required?
-
Is it seal to the lot proper?
ACCESS 3
-
Location of access
-
Is it a single access or double width access
-
Is the development able to achieve sight distance
-
Does the access comply with Council's required gradients
-
Type of access
-
Does the access comply with KSD 1-07
-
Is the access concrete
-
Does the access need comply with KSD 2-02a
-
Is a culvert required?
-
Are head walls required?
-
Is it seal to the lot proper?
ACCESS 4
-
Location of access
-
Is it a single access or double width access
-
Is the development able to achieve sight distance
-
Does the access comply with Council's required gradients
-
Type of access
-
Does the access comply with KSD 1-07
-
Is the access concrete
-
Does the access need comply with KSD 2-02a
-
Is a culvert required?
-
Are head walls required?
-
Is it seal to the lot proper?
ACCESS 5
-
Location of access
-
Is it a single access or double width access
-
Is the development able to achieve sight distance
-
Does the access comply with Council's required gradients
-
Type of access
-
Does the access comply with KSD 1-07
-
Is the access concrete
-
Does the access need comply with KSD 2-02a
-
Is a culvert required?
-
Are head walls required?
-
Is it seal to the lot proper?
FOOTPATH
-
Is there a footpath?
-
Footpath construction type
-
Is there footpaths and do they comply with KSD's?
-
Photos