Post-rainfall inspection (>10mm in 24hrs)
-
Last rainfall date:
-
Rainfall volume:
-
Zones / Areas inspected:
-
Conducted on
-
Prepared by
-
Personnel
General
-
ERSED - Do any erosion controls require maintenance or repair to prevent soil loss before the next rain event? e.g. whoa boys, rock lined drain
-
ERSED - Do any sediment controls require cleaning out or reinstating to prevent soil loss before the next rain event? e.g. sumps, sed fences, coir logs, etc
-
If outlet controls have failed / overtopped, have receiving water bodies been inspected and evidence collected ?<br>(Water Quality samples, GPS coordinates, photos)
-
Do ERSED controls need cleaning out or to be repaired or maintained?<br>(If controls have less than 30% capacity answer Yes)
-
Crossings / Waterways - has any erosion been caused within the crossing and or the batters and banks?
-
Have the crossings been stabalised with protective measures e.g. geo-fab, soil binder, flexterra?
-
Has background water monitoring been taken? Has there been any increase in turbidity due to construction works?
-
Do rehabilitated areas have any signs of erosion and or scouring?
-
Do any bellholes, open excavations or low points need dewatering?
-
If answer is Yes (above), has a suitable discharge location been identified, controls procured and crew trained?
-
Has Water Release Approval been issued for all dewatering activities?
-
Are additional controls required to be installed before waters can be discharged?
-
RoW Boundary - Are there any signs of failure of controls resulting in uncontrolled dirty water or sediment discharging from site?
-
Bunding - Has any bunded pallets or spill trays filled with water?
-
Exclusion Zones - Are all exclusion zones clearly flagged off and signed?
-
Stockpiles - Are stockpiles adequately protected or stabilised to prevent soil erosion?
SUMMARY
-
Has any sediment left site? To what extent has this occurred? What are the actions required to rectify the issue?
-
Have photos been taken of areas where works or maintenance is required?
-
Has an Environmental Action list been prepared and register been updated?
-
Do ERSED Plans need to be updated or ECDNs be raised?