Title Page
-
Conducted on
-
Prepared by
-
Location
Safety
-
Plant Room secured on arrival
-
Are you aware of your escape routes and fire exit locations
-
Are Fire Extinguishers | First Aid Kits | Eyes Washes on site & in date
- Fire Extinguishers Present
- Fire Extinguishers Not Present/Not in date
- First Aid Kit Present
- First Aid Kit Not Present/ Not in date
- Eye Wash Present
- Eye Wash Not Present
Visual Inspection (Damage and Abnormalities)
-
Pipework | Valves | Lagging | Fixings
- Pipework Pass
- Pipework Fail
- Valves Pass
- Valves Fail
- Lagging Pass
- Lagging Fail
- Fixings Pass
- Fixing Fail
- Other Fail
-
Pumps
- PRI LTHW VT Pumps
- PRI LTHW CT Pumps
- SEC LTHW VT Pumps
- SEC LTHW CT Pumps
- Shunts Pumps
- SEC HWS Pumps
- Stratification Pumps
- Fail
-
Are the pumps controlled via External BMS or Local Inverters
- External BMS
- Local Inverter
- Single Speed
-
Do pumps require any maintance works
- YES
- NO
- Primary Shunt Pumps
- Secondary LTHW Pumps CT
- Secondary LTHW Pumps VT
- Secondary HWS Pumps
-
What maintenance works is required
- Bearing Replacement
- Shaft Seal Replacement
- None
-
CHP
-
Boilers
-
Pressurisation Units | Degassers | Filling Loops
- Pressurisation Units
- Degassers
- Filling Loops
- Fail
-
Filters
-
Is there a Elysator on site?
-
Is there a X Pot on site?
-
Electrical System including BMS & Programmers
-
Plant Room: Doors | Ventilators | Duct work
-
Is there any mechanical venatilation
-
Is the cooling ventilation adequate ?
-
Is the Plant room clean from excessive dust?
-
PRI System Expansion Vessel
- Pass
- Fail
- Open Vented System
- N/A
-
SEC System Expansion Vessel
- Pass
- Fail
- Open Vented System
- N/A
Testing of Plant
-
Tested Pumps Duty
-
Tested Boilers Duty Operation (For Operation only not Gas Safety Checking)
-
Tested Pressurisation Unit
- PRI Pressurisation Unit
- SEC Pressurisation Unit
- Fail
- Unable to test function of PRI
- Unable to test function of SEC
-
Tested LED Lighting on Control Panel
Commercial Sites
-
Is the plant floor sealed?
-
Does the Plant room require painting?
-
Is there a commercial kitchen on site?
-
Is there Gas laundry appliances?
-
Is there Emergency Lighting working/present?
-
Is there a cold water tap on site?
-
What key is currently being used for the Plantroom ?
- PR2
- PR13
- R14
- FB1
- FB4
- Gas Triangle Key
- Lock Fault
- Non of the above (Please Specify)
-
What key is currently being used for the Gas Meter?
- PR2
- PR13
- R14
- FB1
- FB4
- Gas Triangle Key
- Lock Fault
- Non of the above (Please Specify)
Maintenance Tasks
-
Cleaning of Plant room sweep out and clear rubbish
- Cleared Rubbish
- Waste Removal Team Required
-
X Pot Flushing & Cleaning
- Flushed & Cleaned
- Micron Filtration Bag Required
- X Pot Not Present
-
Flushed Dirt Air Separator
Temperature & Pressure Recording
-
Primary Circuit System Pressure (BAR)
-
Secondary Circuit if Applicable (BAR)
-
Flow Temperature
-
Return Temperature
Completion
-
PPM Visit Completed