Title Page
-
Conducted on
-
Prepared by
-
Location
Safety
-
Was the Plant Room secured on arrival
-
Are you aware of your escape routes and fire exit locations
-
Have you got the correct tools to carry out the works safely and correctly
3 Monthly Maintenance Tasks
-
Exercised Valves on Site to Ensure Free and Working
- PRI LTHW Circuit Pass
- PRI LTHW Fail
- PRI LTHW Valve Seized
- PRI LTHW Handle missing
- SEC LTHW Circuit Pass
- SEC LTHW Fail
- SEC LTHW Valve Seized
- SEC LTHW Handle missing
- HWS Circuit Pass
- HWS Circuit Fail
- HWS Circuit Valve Seized
- HWS Circuit Handle missing
-
Inline filters inspected
- Yes
- No
- Gasket / O ring replaced
- Non on site
-
Cleaning of Plant room sweep out and clear rubbish
- Pass
- Waste removal team required
-
Cleaned Dirt Air Separators
-
Water Sample Visual Inspection
- Water is clear
- Water is black
- Water is 0range
- Debris is present in water
- Odour is present to water
- No odour is present to water
- Inhibitor / Treatment Required
-
Block Risers Strainer Cleaning & Valve Testing
-
Has the system been dosed with Inhibitor/ Cleaning solution
- Inhibitor added (Please specify brand)
- Cleaner added (Please specify brand)
- No
Temperature & Pressure Recording
-
Primary Circuit System Pressure (BAR)
-
Secondary Circuit if Applicable (BAR)
-
Flow Temperature Exiting Plant Room Degrees C
-
Return Temperature Entering Plant Room Degrees C
completion
-
PPM Visit Completed