Information
PRE DEPARTURE CHECKLIST
-
Audit Title
-
Conducted on
-
Location
PASSAGE PLAN
-
Obtain up to date weather forecast
-
Prepare passage plan
-
Post passage plan on Groove
-
Up date Crew and Passenger list
-
Post crew and passanger lists on Groove
-
Post crew and passenger lists at Muster Station
-
Record voyage in Official Logbook
-
Suitable charts are ready for use and marked with passage
-
List of Radio Signals
-
Tide Tables
-
List of Lights (night passage)
-
Sailing Directions
BRIDGE
-
Dual watch VHF set to appropriate channel
-
Inform Port Control
-
Inform Pilot
-
Set Radar
-
Sat C printer on for ECG
-
Navtex on and EGC set
-
Steering pumps on
-
Steering working correctly
-
Thruster working correctly
-
Keel up
-
Horn working
Brief Crew on Departure Procedure and Passage Plan
-
Deck
-
Discuss cast off procedure
-
Prepare Anchor
-
Secure Tenders and lock down hatches
-
Check for stowaways
-
Interior
-
Guest safety breifing
-
Secure interior
-
Close portholes
-
Engineering ready for sea
-
2 Generators online
-
Fuel ok
-
Gearbox test
-
No alarms active
-
Set AIS for new voyage
-
Record checks are made in navigation logbok
-
Select date
-
Add signature